Commissioning, Startup, Operation, and Shutdown
XHD Installation, Operation, and Maintenance Manual
45
Figure 27: Impeller clearance measurement
Set impeller to Suction Seal Ring Clearance Dial Indicator Method
WARNING:
Failure to disconnect and lock out driver power may result in serious physical injury or death.
Always disconnect and lock out power to the driver before performing any installation or
maintenance tasks.
• Electrical connections must be made by certified electricians in compliance with all
international, national, state, and local rules.
• Refer to driver/coupling/gear manufacturer's installation and operation manuals (IOM) for
specific instructions and recommendations.
•
The impeller clearance setting procedure must be followed. Improperly setting the
clearance or not following any of the proper procedures can result in sparks, unexpected
heat generation, and equipment damage.
NOTICE: In order to use this method for setting the impeller clearance, the unit must be
assembled with the Adjustable Suction Seal Ring. For units assembled without the adjustable
suction seal ring, skip this section and refer to:
Set impeller clearance dial indicator method -
All of the instructions that are stated in the following steps are based on viewing the unit from
the rearward (drive) end.
1. Remove the coupling or v-belt guard.
2. Loosen the two adjusting nuts (415A) on the forward sides of the bearing frame adjustment
plates (234F) by turning them counterclockwise. This will temporarily hold the frame in
place until step 15 is completed.
3. Loosen but do not remove the adjustment plate hold-down bolts (352G) and nuts (427D)
that clamp the bearing frame adjustment plates (234F) to the pedestal (131). Do not
remove the adjustment plate hardware. Keep hardware finger tight to keep the power frame
constrained to the pedestal.
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...