Kinematic viscosity at 40°C | 104°F
46 ±4 mm2/s
Flash point (acc. to Cleveland)
+175°C | +347°F
Setting point (Pourpoint)
-15°C | 5°F
Application temperature *
higher than permitted bearing tempera-
ture
* For ambient temperatures under -10°C | 14°F another suitable type of lubrication oil must be used.
Request required.
Oil quantity
Bearing bracket
Oil quantity in l
24
0,5
32
1,1
42
1,4
48
1,7
Grease lubrication
Re-greasing
•
Grease lubricated bearings with the possibility of re-greasing must be re-lubricated all 4000 operat-
ing hours, but at least 1x year. Clean lubricating nipples (636) first.
Quality of grease lubricant
... corresponding to NLGI GRADE 2
Quantity of re-greasing (approx. value)
Bearing bracket
bearing at pump side
bearing at drive side
24
9g / 10cm3
14g / 16cm3
32
13g / 15cm3
20g / 22cm3
42
18g / 20cm3
33g / 35cm3
48
23g / 26cm3
42g / 46cm3
•
If the pump is left non-operational for a longer time, the grease in the bearings should be changed
after 2 years.
6.5 Coupling
Check the clearance in the coupling components regularly approx. every 1000 operating hours, but at
least 1x year, the radial clearance in the coupling parts must be checked.
For couplings with rubber pads the following applies: Unless a clearance in the couplings is necessary,
the coupling pads may wear out to approximately ¼ of their usual thickness, before they have to be
changed. To measure the clearance in the coupling place a mark on the O.D. of each coupling hub (see
following pic). Then fixing one hub, turn the opposite hub as far as possible. Then measure the distance
(ΔS
V
) between the marks of the coupling. If this measure exceeds the value given in the chart, the pack-
ings must be replaced. They must be replaced in sets.
Figure 14: Coupling clearance
6.5 Coupling
Model ICP, ICPI, ICPH, ICPIH Installation, Operation and Maintenance Instruction