Installation
Auxiliary-piping checklist
Precautions
WARNING:
•
Cooling systems such as those for bearing lubrication and mechanical-seal systems must be
operating properly to prevent excess heat generation, sparks, and premature failure.
•
Sealing systems that are not self-purging or self-venting, such as plan 23, require manual
venting prior to operation. Failure to do so will result in excess heat generation and seal failure.
NOTICE:
The mechanical seal must have an appropriate seal-flush system. Failure to do so will
result in excess heat generation and seal failure.
When to install
You may need to install auxiliary piping for bearing cooling, seal-chamber cover cooling,
mechanical seal flush, or other special features supplied with the pump. Consult the pump data
sheet for specific auxiliary piping recommendations.
Checklist
Check
Explanation/comment
Checked
Check that the minimum flow for
each component is 1 gpm (4 lpm).
If the bearing and seal chamber
cover cooling are provided, then
the auxiliary piping must flow at 2
gpm (8 lpm).
Check that the cooling water pres-
sure does not exceed 100 psig
(7.0 kg/cm
2
).
Final piping checklist
Check
Explanation/comment
Checked
Check that the shaft rotates
Rotate the shaft by hand. Make
smoothly.
sure there is no rubbing that can
lead to excess heat generation or
sparks.
Re-check the alignment to make
If pipe strain exists, then correct
sure that pipe strain has not
the piping.
caused any misalignment.
34