5.9 Seal the shaft with a packed stuffing box
NOTICE:
Packed stuffing boxes are not allowed in an ATEX-classified environment.
1.
Make sure the stuffing box is clean and contains no foreign material.
2.
Install the gland studs into the casing if they are not already installed.
The stuffing box packing is furnished in the box of fittings that accompanies the pump. When you
are packing the stuffing box, use the following order for the packing and lantern rings:
1.
Two packing rings
2.
Lantern ring
3.
Last three packing rings
1
2
3
1.
Lantern ring flush connection
2.
Two-piece, investment-cast 316 SS plain gland (non-quench)
3.
Stuffing box bushing
3.
Twist the packing ring sideways just enough to get it around the shaft or sleeve.
Packing Rings
Correct
Incorrect
Figure 26: Packing rings
4.
Twist the lantern ring halves just enough to get them around the shaft sleeve.
Two pieces make one ring. The notches must face each another but do not need to be aligned.
Lantern Rings
Correct
Incorrect
Figure 27: Lantern rings
5.
Install the packing and lantern ring in the proper sequence.
5.9 Seal the shaft with a packed stuffing box
Model 3410 Installation, Operation, and Maintenance Manual
45