Please visit www.itc-us.com for warranty info
3030 Corporate Grove Dr. • Hudsonville • MI • 49426
Phone: 616-396-1355 • www.itc-us.com • [email protected] • DOC#: 710-00157 • Rev B: 02.13.20
Connect power supply to the AC power cord.
2.
Connect the power supply to the DC power cord. Then
connect the DC Power Cord to the T Connector.
3.
Connect the 30” jumper cables to the T Connector.
4.
Pre-layout lights to plan out your installation. Considerations should be taken for wire routing, mounting clip locations and mounting,
distance to the plants, etc. Identify a location to mount the power supply. Test fit wire leads between the power supply and the lights
to ensure there is enough length of wire. Wire routing should avoid moving parts, pinch points or sharp edges.
1.
POWER SUPPLY &
AC POWER CORD
PN: 810-0355
SEAL CAP
PN: 360-00434
T CONNECTOR
PN: 810-0280
MOUNTING CLIPS
PN: 150-00245
30" JUMPER CORDS
PN: 690020.090
PROPEL LIGHTS
PN: FL01-YY-XXXX
DC POWER CORD
PN: 460-00152-XX
6" JUMPER CORDS
PN: 460-00151-XX
POWER SUPPLY &
AC POWER CORD
PN: 810-0355
T CONNECTOR
PN: 810-0280
DC POWER CORD
PN: 460-00152-XX
30" JUMPER CORDS
PN: 690020.090
Install the power supply to the mounting location using
screws through the provided flanges on the power supply.
Be sure all cords will be able to reach lights.
5.