11
Air baffle
The air baffle optimizes air flow through the node and promotes node cooling in 2U Isilon IQ nodes.
The air baffle optimizes air flow through the node and promotes node cooling in 2U Isilon IQ nodes. Before servicing any
node components attached to the motherboard, you must remove the air baffle. After servicing the node, replace the air baffle.
General ESD guidelines
Always follow electrostatic discharge (ESD) prevention procedures when removing and replacing cards, memory, and other
system components. You must use a wrist strap, attached to the node chassis, for grounding.
Required hardware
•
ESD grounded wrist strap
•
#2 Phillips screwdriver or #2 JIS driver
Removing the air baffle
1. From the command-line interface, enter
shutdown -p now
to shut down the node.
2. Unplug both power cables from the back panel of the node.
3. Remove the top panel from the node.
4. Loosen the captive screw that secures the riser card support bracket, pivot the bracket toward the back of the node,
and lift the bracket out.
39
Содержание IQ S Series
Страница 1: ...Isilon IQ S Series Field Replacement Manual August 2010 120 0031 01 Rev C ...
Страница 4: ...Chapter 11 Air baffle 39 Removing the air baffle 39 Installing the air baffle 40 ...
Страница 8: ......
Страница 18: ......
Страница 22: ......
Страница 26: ......
Страница 36: ......
Страница 42: ......
Страница 44: ......