![ISCO GLS Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/isco/gls/gls_pocket-manual_2092372015.webp)
Section 1 Installation
1-11
Note
Sampler inhibit signal (pin F) requirements - a low
(grounded) level of at least 5 seconds inhibits the
operation. A high (or open) level of at least 5 seconds in
duration restores the operation.
1.10 Positioning the GLS
There are a few considerations when selecting a
site for the GLS. The foremost concern should
be personal safety.
WARNING
The installation and use of this product may
subject you to hazardous working conditions that
can cause you serious or fatal injuries. Take any
necessary precautions before entering the
worksite. Install and operate this product in
accordance with all applicable safety and health
regulations, and local ordinances.
The following points should also be considered:
•
Level surface
- The GLS should be placed
on a level surface to prevent tipping or
spills.
•
Support
- The surface or mounting
method must be able to support the GLS
at full capacity. A GLS with battery, full
sample bottle, and ice may weigh as
much as 63 pounds (28.6 kg).
•
Environmental
- The GLS is designed for
use in harsh environments. However, you
should avoid installing the GLS in
Содержание GLS
Страница 2: ......