Страница 1: ......
Страница 2: ...re mixing tank The connecting pipes between the fertilizer tanks and injection group must be of the same length 1 1 Connection to the main line The DOSABOX must be connected to the irrigation network...
Страница 3: ...e holder Arrange a derivation about two meters after the injection point to feed the probe holder For the connection use de supplied fittings and micropipe 2 USE AND MAINTENANCE 2 1 Setting up Start t...
Страница 4: ...to ON and the selector to AUTO Adjust the suction rate of each channel using the approriate micrometric valves noting the values indicated by respective flow meters Adjust the pump flow to maintain t...