Page 20
Foam Installation
Measure the distance between the Side Arm Hinge and
the closest part to the window frame in line with the Side
Arm.
Add 1/4
” to this distance and cut the Side Arm Foam to
length.
Apply Window Sealing Foam to the Side Arm
Foam.
Note: The Window Sealing Foam attaches to the
side next to the air conditioner.
Содержание U-SHAPE Series
Страница 6: ...Page 6 ...
Страница 27: ...Page 27 Function Buttons ...