Appearance upon completion of Step 6.
6A. Insert both Wide Grip Pull Up Bars (F) into the slots at the top of the
Upper Posts (J) and attach by using:
4 - (7)
Hex Bolt M12x1.75x80L
8 - (52)
Washer D13.5xD24x2.5
4 - (76)
Nylon Nut M12
6B. Attach the Close Grip Pull Up Bars (G) and Mounting Plates (L) to Upper
Posts (J) by using:
4 - (7)
Hex Bolt M12x1.75x80L
8 - (52)
Washer D13.5xD24 x2.5
4 - (76)
Nylon Nut M12
Thoroughly tighten the hardware once complete.
6C.
Insert the Adjustable Handlebars (E) into the lowest set of holes marked
and , secure them into place by using:
2 - (103)
Locking Pin
Φ
8*10
STEP
6
20
Содержание Power Tower
Страница 2: ......
Страница 8: ...6 ...
Страница 9: ...EXPLODE DRAWING 7 ...
Страница 10: ...HARDWARE PACK 8 ...