IRIS IRMA 6 - Руководство по установке скачать бесплатно. Скачайте подробное руководство по установке IRIS IRMA 6 с нашего сайта. Настройте ваш продукт легко и быстро, следуя инструкциям в мануале. Бесплатное скачивание доступно на manualshive.com.
IRMA6-SENSOR-HD-00-SWITCH-(IO)-00-(R)(1)
Installation Manual | Released
Rev. 1.4 | 12/2020
27
/ 27
7
Drilling templates
There are 2 kinds of templates in (mm):
•
for retrofitting with hand tools
for original equipment manufacturers (CNC machining)
Страница 1: ...Pos 2 IRMA Sensoren_5 _ Automatic Passenger Counting IRMA 6 Installation Manual IRMA6 SENSOR HD 00 SWITCH IO 00 R IRMA6 SENSOR HD 00 SWITCH 00 R Rev 1 4 12 2020 ...
Страница 2: ...website See annex Please note down Information Download Instruction Disclaimer The information contained in this document is based on product data resulting from the development and approval phases as well as the production of initial samples These specifications do not claim to be error free and will need to be updated or corrected Such modifications may be made by iris GmbH without notice Charac...
Страница 3: ... of content 1 IRMA 6 overview 4 2 Mounting 6 2 1 Mounting 2 sensors per door 9 3 Connecting IRMA 6 optionally with angled M12 connectors 11 3 1 Ensuring power supply 14 3 2 Connector types 15 4 Configuring IRMA 6 16 5 IRMA 6 components 25 6 Check of the installation 26 7 Drilling templates 27 ...
Страница 4: ...r height The door to IRMA 6 distance must not exceed 20 cm if the installation height is less than 2 m Door height Covered door width Distance max The inclination angle of IRMA 6 must not exceed 5 1 90 m 1 50 m 20 cm For the relation between maximal distance door sensor counting width and the door height see Table 1 p 4 These values are standard values In many cases wider ranges can be covered Ple...
Страница 5: ... components 1 Mounting screws 2 M12 Ethernet connector f 3 M12 Ethernet connector 4 Leaf spring 5 Internal connector 6 Mounting hook 7 Sensor unit 8 Door panel 9 M12 power supply connector m 10 M12 door contact connector on demand f 11 Interface unit IRMA 6 comes with normal M12 connectors or with angled M12 connectors to save space ...
Страница 6: ... supply and optionally to door contacts 3 Configure IRMA 6 via web interface while using RJ 45 service cable and ETH interface 4 Perform a commissioning test on your pc or on board computer In all considerations with regard to installation positions and orientation it is assumed that the observer is inside the vehicle The sensor to door distance must not exceed 20 cm if the installation height is ...
Страница 7: ... saw in the door panel according to measures in attached drilling templates see Drilling templates p 27 Put sensor unit in Fit sensor unit into interface unit Put the IRMA 6 sensor unit via the mounting hook into the drilled hole in the door panel Fit in in the internal connector and the attaching form of the senor unit into the interface unit which is above the door panel Interface unit Sensor un...
Страница 8: ...with a hex key 4 mm on the interface unit For easy and correct connection to the cables Align the M12 connector so that the stop lug is centered toward the top of the labels Connect IRMA 6 Connect IRMA 6 via angled M12 connectors to the Ethernet network to voltage supply and optionally to the door contacts Angled M12 connectors slewable 180 optionally available ...
Страница 9: ... Manual Released Rev 1 4 12 2020 9 27 2 1 Mounting 2 sensors per door If a door is observed by 2 sensors iris recommends the following installation parameters Figure 1 Installation of 2 sensors per door Mounting height Sensor distance 2060 mm 780 mm ...
Страница 10: ...20 10 27 In a 2 doors scenario the door contact signal is connected only to the master sensor The master sensor is identified in the following way Standing inside the vehicle view from inside to the outside the left sensor is the master sensor the right sensor is the slave sensor ...
Страница 11: ... the correct connection points and shield in the connection block of the vehicle and See section Ensuring power supply p 14 for time relay for 30 min overrun power Connect IRMA 6 with Ethernet Connect IRMA 6 from component with the switch via the M12 system Ethernet cable K M12CAT5 XX xm Via Ethernet the connection to the OBU and to the service PC is made Only possible with service PCs having an E...
Страница 12: ...update configuration Only possible with service PCs having an Ethernet interface Connect IRMA 6 to door contact on demand Connect the wire strands of the cable from component either directly to the door control unit or establish a circuit with the wire strands via a limit switch external power supply from vehicle required See cabling diagram for wiring overview of IRMA 6 in the vehicle see Fig 3 p...
Страница 13: ...C 4P 5 0 28R FS SCO RAIL K3 7 Adapter cable for PC connection for service purposes KQ M12CAT5 RJ45 01 xm 8 Wires for setting door contacts and opt Door Clear A Distribution of the vehicle provided power supply to each door for the connection of IRMA 6 and switch The distribution of the vehicle provided power supply to each door is not part of the standard scope of delivery of iris GmbH S PC connec...
Страница 14: ...ev 1 4 12 2020 14 27 3 1 Ensuring power supply 1 Fuse 5 A quick acting 2 Timing relais dropout OFF delay for 30 min minimum 3 Power cable for IRMA 6 K M12POW B oE 04 2m 4 IRMA 6 Fig 4 Power supply of the IRMA 6 sensor with fuse and time relay for 30 min overrun power ...
Страница 15: ...020 15 27 3 2 Connector types Ethernet interface D coded f 5 poles Voltage supply connector A coded m 5 poles Ethernet interface D coded f 5 poles Optional GPIO connector for door contact B coded f 5 poles Fig 5 Pin assignment Rear view on interface unit with connectors Cf Fig 2 ...
Страница 16: ...e device number in the browser bar Start configuring IRMA 6 Change the language via English On the left side you find the navigation for configuring IRMA 6 updating IRMA 6 checking logged error messages visualizing counting data of IRMA 6 Click on CONFIGURATION to get to the points INSTALLATION and ETHERNET At the point INSTALLATION you set door function area sabotage detection status LEDs install...
Страница 17: ...tion and Door Close Delay with the value of the time determined between the door closing signal sent by the on board computer and the actual mechanical closing of the door In the section Status LEDs you set OFF as this is the default LED setting of the sensor In the section Installation Parameter you set the parameters for the placement of IRMA 6 according to the measures in the vehicle Measure th...
Страница 18: ...r on the floor with an adhesive marker The distance from the sensor to the adhesive marker is the mounting height Measure the distance and enter the value measured Door to sensor distance is the horizontal distance from the sensor to the closed door This parameter marks the boundary between the inside and the outside of the vehicle in order to differentiate between boarding the vehicle and alighti...
Страница 19: ... between the vehicle edge and the adhesive marking and Rotation angle X is the inclination angle of the sensors visual axis x axis when the vehicle is stationary on a level plane Sensors directed towards the inside have a positive angle This angle must not be 5 otherwise the counting accuracy is reduced Measure the sensor s angle of rotation e g using a suitable smartphone app and enter the value ...
Страница 20: ...he vehicle interior Left right door clearance passage width is the horizontal distance between the sensor and the left right opened door parallel to the vehicle edge Enter 0 mm if there is no opened door in the sensor viewing range Set 0 mm if there is no obstacle between the adhesive marker and the left right lateral boundary when the door is open Top view Left wall distance Right wall distance L...
Страница 21: ...e the opening angle and enter the value measured Retain the value of 0 if the doors do not open towards the outside In the section Sabotage Detection you check the field Enable Sabotage Detection to enable the sabotage detection Set the value 5 in the field Sabotage Aggregation in order to suppress unwanted and intermittent activations of the sabotage detection Opening angle left right outward swi...
Страница 22: ...k APPLY to the set the data from all sections of CONFIGURATION Wait until the green bar confirms that the configuration is applied Click on ETHERNET to get to the IP configuration of IRMA 6 In the section IP Configuration you can if needed set address configuration IP address net mask gateway ...
Страница 23: ... 1 Installation Manual Released Rev 1 4 12 2020 23 27 Click on LOG to see recorded error states See the field Log Level Support Level and Number of Log Entries for logged error messages Click on VISUALISATION to visualize counting data ...
Страница 24: ...al Released Rev 1 4 12 2020 24 27 See boarding and alighting persons in real time Via Image Type you can switch viewing type between Depth and Intensity error messages Click OK if IRMA 6 needs to be restarted because of error messages recorded in the log ...
Страница 25: ...e switch 1 power supply interface Power supply connector m IRMA 6 interface unit for connection principle see section see Connector types p 15 3 2 1 door contact interface on demand Door contact and or door clear optional f M12 power cable for IRMA 6 K M12POW B oE 04 2m M12 cable for power supply of IRMA 6 1x M12 connector f CAN type two wires and shield for connection to the vehicle provided powe...
Страница 26: ...d 2 Is their mounting position correct 3 Have all IRMA 6 connecting cables been attached to the interface unit 4 Is the IRMA 6 power supply connected 5 Is the switch power supply connected 6 Is the switch connected to the onboard computer 7 Do the infrared LEDs of IRMA 6 light up when the door is open Please check separately for each door 8 Are the infrared LEDs of the IRMA 6 out when the door is ...
Страница 27: ...HD 00 SWITCH IO 00 R 1 Installation Manual Released Rev 1 4 12 2020 27 27 7 Drilling templates There are 2 kinds of templates in mm for retrofitting with hand tools for original equipment manufacturers CNC machining ...
Страница 28: ...tion Drilling template IRMA 6 Frontend Unit mm inch Surface Material Production status iris Part No Page Creator Name Date Approved Editor Date Description of change Index For retrofitting with hand tools We reserve all rights in this document and in the information contained therein Reproduction use or disclosure to third parties without express authority is strictly prohibited 157 5 1 53 1 R 5 0...
Страница 29: ...Drilling template for BB_GEN6 FE F_00 Scale 1 1 reference dim Printer setting set option Actual size 157 5 53 ...
Страница 30: ...Drilling template for BB_GEN6 FE F_00 Scale 1 1 Printer setting set option Actual size reference dim 157 5 53 ...