Page | 65
Reordering Run Orders
Once loaded into the Run Orders pane each run order can be moved by dragging and dropping them
within the pane. Click to select then hold down left mouse button and drag to reorder.
Please Note: The live Run Order can be moved in this way when active, you do not have to deactivate
it to move it.
Renumbering Run Orders
When in non-news operation a user can renumber stories in the Active Run Order window.
C
lick on a story, right click and select Renumber From….
To launch the Renumber Stories pane.
Prefix:
This can be alpha/numerical and will be placed at the front of the story number.
Adding a prefix is not mandatory.
Start From:
This must be numerical. It will increase the number of each subsequent story number by 1.
Adding a Start From number is mandatory.
Click OK to close and the Renumbering will be applied.
Please Note: Renumbering stories begins from the selected story. To renumber all stories in a Run Order, apply
the renumbering to first story in the Run Order.
Содержание autoscript WinPlus-IP
Страница 1: ...WinPlus IP Software Installation Operation Guide S W Ver 1 12 0 144 PNo A9009 4983...
Страница 242: ...Page 241 iEVO Network Connection Examples Local Network iPad iPhone Connection...
Страница 243: ...Page 242 Remote Network iPad iPhone Connection...
Страница 265: ...Page 264 Notes...