background image

                                                                                                      ARA DOCK4 User Manual V1.0 

 

P

ion

eering Gas Sensing Technology.

 

Page 8 of 15 

ionscience.com

 

Prepare the ARA DOCK4 for test 

Equipment Installation  

The ARA DOCK4 can be located on a desk-top/workbench or wall mounted. A wall mount kit is 
available from ION Science p/n 908224.   

Select a suitable installation location. Each module or gang of connected modules requires: 

-

 

Place the ARA DOCK4 on a clean, dry work surface. 

-

 

Access to calibration gas cylinder Inlet and Outlet tubes to clean air. 

-

 

Access to a network connection, if using. 

 

WARNING: 

The equipment must be used only in a normal atmosphere (20.9% v/v O2) that is 
free of hazardous gas.  

WARNING: 

Do not use the equipment in a hazardous area. 

WARNING: 

Failure to adhere to this caution can lead to fire and/or explosion. 

WARNING: 

Do not install near heat sources or on vibrating surfaces. 

WARNING: 

The equipment is intended for indoor use only. 

WARNING: 

This equipment uses potentially harmful gas for calibrations. The equipment must 
be attached to a venting system or be used in a well-ventilated area. 

Charging 

The ARA DOCK4 is powered by External 12Vdc Adapter and internal rechargeable battery. Connect 
the supplied 12Vdc adapter to the DC Jacks on the ARA DOCK4 to charge the battery. A complete 
charge takes approximately 3 hours. The fully charged ARA DOCK4 can perform up to 750 bump test 
cycles with 4 Unit Test. 

-

 

The charger is for indoor use only. 

-

 

The ARA DOCK4 only charges using DC power. 

-

 

The ARA DOCK4 will not charge while bump tests or calibrations are being performed. 

-

 

If the battery is low, charge the ARA DOCK4 for 30 minutes then begin a test. When the test is 
complete resume charging the battery. 

 

Calibration Gas Installation

 

The ARA DOCK4 needs a calibration gas cylinder to be installed to perform tests on the gas 
detectors. The procedure to install gas cylinder is as follow. 

1)

 

Remove the Access Hatch Screws and lift the access panel. 

2)

 

Put gas cylinder into the holder and thread into the fitting until tight. 

3)

 

Check if gas gauge indicates the gas cylinder pressure. 

4)

 

Wrap around with rubber strap 

 

Содержание shawcity ARA DOCK4

Страница 1: ...er Manual V1 0 Pioneering Gas Sensing Technology ionscience com Distributed by 91 91 92 Shrivenham Hundred Business Pa Watchfield Oxfordshire SN6 8TY Tel Email Web 01367 899558 info shawcity co uk sha...

Страница 2: ...rging 8 Calibration Gas Installation 8 Set Ventilation Flow Path 9 Operate the ARA DOCK4 10 Turn on off the ARA DOCK4 10 Set gas detectors on Test Bays 11 Start Tests 11 Management of the ARA DOCK4 12...

Страница 3: ...at any time and without any notice to remove amend or vary any of the content which appears in this manual Symbols WARNING USED TO INDICATE DANGER WARNINGS WHERE THERE IS A RISK OF INJURY OR DEATH Ca...

Страница 4: ...exercise due care and follow the appropriate regulations when disposing Always adhere to local regulations and procedures when disposing of the equipment ION Science Ltd offers a take back service Ple...

Страница 5: ...two power sources A 12V DC mains power supply and an internal rechargeable battery The internal rechargeable battery provides approximately 5 hours of continuous operation based on 4 ARA s inserted T...

Страница 6: ...coupler Used to supply fresh air Exhaust Outlet 1 8 Hose Barb coupler Gas and fresh air used in the test are exhausted here Calibration Gas Pressure Gauge Gauge for checking Gas remaining Max 1 500 p...

Страница 7: ...on IrDA communication Sensors Audio and optical Tests Bump Calibration Data Transfer Audible alarm visual alarm Gases Available H2S 25ppm CO 100ppm O2 18 SO2 10ppm Adjustable Gas Cylinder Compatible w...

Страница 8: ...l gas for calibrations The equipment must be attached to a venting system or be used in a well ventilated area Charging The ARA DOCK4 is powered by External 12Vdc Adapter and internal rechargeable bat...

Страница 9: ...RNING Ensure that all calibration gas cylinders are in good condition WARNING Ensure that all calibration gas cylinders contain enough gas WARNING This equipment uses toxic gas for calibrations The eq...

Страница 10: ...ARA DOCK4 If it is powered the Power Button will light up according to the ARA DOCK4status 1 The ARA DOCK4 can be operated when the Power Button lights up green 2 The ARA DOCK4 will automatically turn...

Страница 11: ...alibration Green Calibrates the detectors measurement accuracy against the applied gas 1 After gas detectors are installed press Bump Test Button of Calibration Button to start tests 2 A bump test wil...

Страница 12: ...s an ethernet and USB port Either ports can be used to connect to a PC Dock4Manager Software Features Change gas configurations If a calibration gas cylinder of different gases or concentrations is on...

Страница 13: ...of the equipment 3 Do not attempt to disassemble adjust or service the equipment unless instructions are provided to perform a procedure or a component is listed as a user replaceable component in the...

Страница 14: ...eplace the empty gas cylinder Gas cylinder does not fit to tubing and cannot be installed to ARA DOCK4 Inspect the tubing and replace with new one if it is damaged Power Buttons is blinking red Check...

Страница 15: ...ce com in Email kschari ionscience com ION Science Inc USA Office Tel 1 877 864 7710 Web https ionscience com usa Email info ionscienceusa com ION Science Italy Italy Office Tel 39 051 0561850 Web www...

Отзывы: