![INVT BD100KTR-P Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/invt/bd100ktr-p/bd100ktr-p_manual_2085726014.webp)
13
④ when the battery is full, turn off the generator automatically, BD 30-150kW-P transfer to
① mode
4.1.3
Maintenance mode
4.2 Energy Storage Inverter Function
4.2.1 Overheating And Cooling Operation
The inverter operates at set power when IGBT junction temperature is less than 105 C.
When the junction temperature of IGBT is higher than 105 C, the IGBT will be operated
at a set power percentage.
4.2.2 Cooling System Start-Up
The air-cooled system will start automatically when the energy storage inverter
reaches the rated power or temperature threshold.
4.2.3 Cold Start System
For off-line operating models, it is necessary to start directly through the battery to
supply power to the load, which can be operated manually.
Содержание BD100KTR-P
Страница 1: ...BD 30 150kW P Inverter User Manual...
Страница 19: ...18 Figure 5 2 Packaged Handling Figure 5 3 Unpackaged Handling...
Страница 23: ...22 Figure 5 12 500 kW 630 KW Vent Size...
Страница 41: ...40 Figure 8 9 System_System Settings...
Страница 43: ...42 Figure 8 11 Switch menu...