18
ASSEMBLY AND INSTALLATION
inVENTer PAX standard set
•
Installation and operating instructions
4.2
Create wall opening/drill holes
DANGER
There must be no electrical wires laid beneath the location of the planned drill holes.
Electric shock and injury due to live components (230 V, 50 Hz)!
►
Before creating wall openings, check for cables and wires laid beneath the plaster.
CAUTION
Falling masonry when creating the wall opening.
Injury to persons and/or damage to property!
►
Use adequate protection against falling masonry.
►
Remove objects from the immediate vicinity.
Milling drill with Ø 160 mm, drilling bit Ø 8 mm,wall chaser, adhesive tape, marker pen
Requirements:
The masonry must be dry and in a load-bearing condition.
There must be no load-bearing elements at the location of the planned wall openings.
►
Secure the drilling template to the ceiling with
adhesive tape.
►
Mark the position of the mounting plate at the
corners of the drilling template (red circles).
►
Mark the position for the drill holes:
• 6 oblonged holes for fastening the main module
(freely selectable, preferably on outer edge).
• 2 bore holes for the wall opening centers.
►
Remove the drilling template.
►
Drill the 8 holes with Ø 8 mm, min. 50 mm
deep to the ceiling and interior wall.
►
Create 2 wall openings for the wall duct.
Ö
The wall openings and bore holes are created.