© INUX3D 2022
V1.1
Place the handle on top of
the YP cage and
very loosely
tighten
the 2x M5x10 bolts into
the T-nuts
Now that you have both bolts
attached, slide the handle left
or right to centre it
You may now tighten the bolts
A
This is simply a zoomed in
view of how a cable manager
assembly should look once
attached
PK1 PRO STREAMER YP
Assembly Instructions Page 4 of 5
2
3
1
Attaching the cable managers
requires the use of an M4x8mm
bolt through the cable manager
and into an M4 drop in nut.
Note that the nut fits into the
slot of the aluminium bar
1. Place the bolt through the
cable manager hole and very
loosely into the drop in nut
2. Position the drop in nut so that
it fits into the slot of the bar
3. Tighten the bolt so the drop in
nut turns and locks into place
at the position you require