![Intracom WiBAS Connect Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/intracom/wibas-connect/wibas-connect_commissioning-manual_2081786044.webp)
6. Equipment Commissioning
44
WiBAS-OSDR Hub
Introduction
This paragraph describes the antenna alignment for the following cases:
Precaution
Never leave unoccupied receptacles without cover. Covering receptacles is
necessary to protect against humidity penetration.
Prerequisite
Please refer to
item 1
4.1 / Sectoral and Parabolic Antenna Procedure).
Mounting kit
overview
For antennas mounting kit details please refer to
item 1
on page
(Chapter 4 / Section 4.1 / Sectoral and Parabolic
Antenna Procedure).
Procedure
For antennas final adjustment details please refer to
item 1
on page
(Chapter 4 / Section 4.1 / Sectoral and Parabolic
Antenna Procedure).
End of procedure.