
67
11.1 Pre-filter with back wash
The pre-filter should be checked every 3 months, and cleaned if necessary. The auto-clean interval can
then be extended depending on the build-up of contaminants.
The integrated non-return valve (PR100-M) must be checked twice a year and cleaned of any deposits.
11.2 Filtration and backwash pump
It is recommended that a function test of the pumps is carried out every six months. Each pump is started
in the test menu. (Can be also used to check the flow.)
In the case where one pump should fail, the complete double pump unit should be replaced.
It is suggested that the filtration and backwash pump set be replaced after 20,000 hrs running time.
11.3 Float Switch / Level Sensor
It is recommended that a function test of the float switch is carried out every six months. The float switch
is tested by manually positioning it into the two switch positions (Empty=lower position /Full=upper
position) while the display is checked.
Fig.: lower position ->Display =
Br
min
-
Fig.: upper position ->
Br
min
+
Testing of the level pressure sensor: The water level display must be compared with the actual water level.
Содержание AQUALOOP GW 10800
Страница 10: ...9 Tab Official listing https www intewa de en applications rain greywater harvesting greywaterrecycling...
Страница 12: ...11 Fig AQUALOOP System 1200 L day 317 GPD Fig AQUALOOP System 1800 L day 476 GPD...
Страница 13: ...12 Fig AQUALOOP System 3600 L day 952GPD Fig AQUALOOP System 5400 L day 1428 GPD...
Страница 37: ...36 Fig Electrical connection plan upper pump lower pump...
Страница 39: ...38 Fig Control cabinet of multiple membrane station controller...
Страница 42: ...41 7 1 3 Expansion membrane station controller Fig Control cabinet of expansion controller...
Страница 89: ...88 Designed and provided by INTEWA GmbH or to be separately approved alternative...
Страница 90: ...89 INTEWA GmbH Version 1 1 a Subject to technical changes...