Interroll Roller Conveyor SH 1110
Maintenance and repair
42
Version 1.0 (06/2022) en
Translation of original operating instructions
Maintenance intervals
If maintenance is not performed according to schedule, it may lead to damages and failures. If
maintenance intervals are not followed, the warranty will be void.
All bearings of the module feature a life-time lubrication and are maintenance-free within the
operating parameters.
Maintenance and inspection list
Component
Interval
Task /
check
Work to be
performed
Performed by
Complete module
Daily
Check for contamination.
Clean and disinfect
Complete module
Weekly
Perform an acoustic check.
Initiate further measures
depending on the
component
Side guides
Monthly
Check attachment and fastening
of side guides.
Readjust as necessary
RollerDrive EC5000
1 month after
installation of
module
Check for firm seating in the side
profile.
Retighten as required
Monthly
Check temperature.
Replace as required
Monthly
Check for noise.
Replace as required
Monthly
Check for damage.
Replace as required
Monthly
Check for true running.
Replace as required
Monthly
Check electrical connections.
Replace as required
PolyVee drive belt
Quarterly
Check for wear/damage.
Replace as required
Complete module
Every 6 months
Check moving parts for seating
and wear.
Replace as required
Rollers
Every 6 months
Check running behavior.
Replace as required
Check for wear/damage.
Replace as required
Bearings
Every 6 months
Check for running noise.
Replace as required
Complete module
Annually
Check screw connections.
Tighten to applicable
standard as required
RollerDrive EC5000
Annually
Ensure that the RollerDrive shaft is
secured properly in the side
profile.
Correct as required