Version 2.5 (11/2020) UL
Translation of the original operating manual
23 of 140
Assembly and installation
¾
Drill two holes with a diameter of 6.5 mm through the markings in the conveyor frame.
¾
Attach the base plate to the conveyor frame with M6 screws.
¾
Make sure the base plate has not been distorted.
¾
Insert the ribbon cables for the power supplies (see „Connecting the power supply“ on page 26).
¾
Place the MultiControl on the left-hand holes and press it down until the lock engages.
¾
Screw the MultiControl onto the base plate (max. tightening torque 2,5 - 2,75 Nm). This drives the piercing
contacts through the ribbon cable and makes contact with the power supplies.
Use the screws provided to attach the MultiControl to the base plate.
Содержание MultiControl AI
Страница 68: ...68 of 140 Version 2 5 11 2020 UL Translation of the original operating manual Appendix ...
Страница 74: ...74 sur 140 Version 2 5 11 2020 UL Traduction de la notice d utilisation originale ...
Страница 136: ...136 sur 140 Version 2 5 11 2020 UL Traduction de la notice d utilisation originale Annexe ...
Страница 137: ...Version 2 5 11 2020 UL Traduction de la notice d utilisation originale 137 sur 140 Notes ...
Страница 138: ...138 sur 140 Version 2 5 11 2020 UL Traduction de la notice d utilisation originale Notes ...
Страница 139: ......
Страница 140: ...INSPIREDBY EFFICIENCY 2020 INTERROLL EN FR UL 11 2020 Version 2 5 1119087 ...