277/480 VAC Four wire plus Ground 

Found in Main Disconnect Switches, 
Main Distribution panels, Load Centers 
Sub panels and equipment locations.

Line

Line

Line

Neutral

Ground

WHITE

BLACK

BLACK

BLACK

277 v

277 v

480 v

480 v

480 v

277 v

Model AG4803C3

Type 1 or Type 2 Surge Protection Device

INSTALLATION INSTRUCTIONS

480 VAC Three wire plus Ground 

Found at Service Entrances and
Meter Cabinets.

Line

Line

Line

Grounded Neutral

WHITE

BLACK

BLACK

BLACK

480 v

480 v

480 v

277 v

277 v

277 v

Risk of Electric Shock

WARNING 

 

•  Thoroughly read instructions before installing unit.

 

•  Installation and Service to be performed by a  

 

 

 

qualified licensed electrician.

 

•  Intended for indoor or outdoor use.

 

•  All wiring must comply with all state and local 

 

electrical codes including the National Electrical 

 

Code and/or Canadian Electrical Code.

•  Suitable for use on a circuit capable of delivering

 

not more than 50,000 rms symmetrical amperes.

•  This unit contains no serviceable parts.

•  This product does not protect against direct 

 

lightning strikes.

Type 1 installation:

A typical installation of a type 1 SPD will be connected between the secondary of the service transformer and the 

line side of the service panel. This installation is intended to be installed without overcurrent protection to the SPD.

 

Type 2 installation:

A typical installation of a type 2 SPD will be connected to the  load side of the service panel and is intended to be 

installed with overcurrent protection to the SPD.
  1.  Determining location:

   

•  Ensure conductor lengths are as short and straight as possible for best performance. Do not coil excess

   

  wire. The SPD functions best if all bends in wires are rounded, ideally to a 4” radius. Hard 90 degree bend 

   

  will reduce efficiency. Cut all leads to the correct length. Do not coil excess leads.

   

•  Install appropriate weatherproof fittings if the unit is to be mounted outside.

   

•  Bracket part number AG1BRKT is also available if needed.

  2.  Connect wires as shown within diagrams. If your application does not match one of the diagrams below 

   

consult your supplier.

  3.  Ensure all mounting and electrical connections are correct and securely fastened. Once energized the green 

   

indicator LED will be ON.

Maintenance:

¡ 

AC Voltage SPD:

 

•  Periodically check SPD to ensure green indicator LED is ON. If green LED is OFF protection has diminished

 

  and the SPD should be replaced immediately.