Intenda Box Tunnel Скачать руководство пользователя страница 1

 

 

 

 

INSTALLATION, USE  AND

 

MAINTENANCE 

 

 

BOX TUNNEL 

BOX TUNNEL 

ECO

 

STADIO BOX 

 

 

 

INTENDA S.r.l. 

Via V. Pareto, 3 

37045 S. Pietro di Legnago (VR) 

Tel +39 0442 601031 – 600270 

Fax +39 0442 25164 

http://www.intenda.it

 -  e-mail: 

[email protected]

 

Содержание Box Tunnel

Страница 1: ...ATION USE AND MAINTENANCE BOX TUNNEL BOX TUNNEL ECO STADIO BOX INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info int...

Страница 2: ...ON AND TECHNICAL SHEET 6 2 1 General description 6 2 2 Components 7 2 3 Fabric s characteristics 10 3 INSTALLATION 12 3 1 Handling and transport 12 3 2 Place and requirements for the installation 12 3...

Страница 3: ...into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only because it is subsequentl...

Страница 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Страница 5: ...law with effect from the date stated on the invoice During this period INTENDA S r l will remove in an appropriate time all vices and defects of the materials and or of the building process only if t...

Страница 6: ...ences folds or partridge s eyes in the PVC clothes should not be considered defects but features of the article 2 BOX DESCRIPTION AND TECHNICAL SHEET 2 1 General description The box must be used only...

Страница 7: ...ESCRIPTION 1 ALUMINIUM PROFILE MM 40x35 2 PVC LG 550 STARPOL ECO TOP COVER 3 WINDOW IN MICRO PERFORATED MATERIAL 4 PVC GABLE END WITH WINDOW IN MICRO PERFORATED MATERIAL 5 PVC BUCKLE 6 STRING FASTENER...

Страница 8: ...C SLIDING CURTAIN 12 PVC WALL WITH WINDOW IN MICRO PERFORATED MATERIAL 13 ALUMINIUM CROSSBEAM 14 GROUND FIXING BRACKETS base v NYLON WHEELS mobile v Only for Box Tunnel and Box Tunnel Eco Only for Box...

Страница 9: ...9...

Страница 10: ...PES 1100 Dtex Fabric s weight 550 gr m2 Characteristics ABUV Finishing gloss lacquered Breaking strength Warp ca 250 DaN 5 cm DIN 53354 Weft ca 180 DaN 5 cm Tear strength Warp 25 DaN DIN 53363 Weft 20...

Страница 11: ...eft 100 PES 1100 Dtex Fabric s weight Ca 650 gr m2 Finishing PVC coated 2 sides Breaking strength Warp ca 250 DaN 5 cm DIN 53354 Weft ca 230 DaN 5 cm Tear strength Warp ca 25 DaN DIN 53363 Weft ca 30...

Страница 12: ...peration is made by hand it is important to consider that the weight limit that each male person can handle is 25 Kg moreover the operators should be equipped with gloves and safety shoes 3 2 Place an...

Страница 13: ...sliding door must be opened photo 2 and only the screws of the lower part of the crosses must be released with an Allen key photo 3 ATTENTION if the screws in the crosses top are released it can cause...

Страница 14: ...the stretching device not included and tightening the screws of the lower part of the crosses photo 5 a 5 b and 5 c MOBILE VERSION putting the tension bars in regular position at 180 photo 6 a and 6 b...

Страница 15: ...manual are not allowed if not previously authorized by INTENDA S r l ATTENTION the box must be fixed to the ground and or to a wall The installer must verify the ground type and conditions and choose...

Страница 16: ...ed in this manual It is useful to explain the correct meaning of some terms used it this manual Dangerous areas any part of the box which can damage a person during handling of the structure Exposed p...

Страница 17: ...between the crosses in horizontal position Link the internal streching devices to the pegs with eyelet placed on the ground then put in tension the structure through the stretching device The structu...

Страница 18: ...e with the instructions It is not possible to use the box in conditions of strong wind and or snow In order to use the product during these adverse conditions a written declarations by Intenda is need...

Страница 19: ...ed by the constructor will cause the dacay of every responsibility of the constructor on the product conformity The constructor suggest to constantly control the box making the scheduled checks and pr...

Страница 20: ...most stressed components 7 DISASSEMBLY Disassembling operations are done backward to the assembly The eventual disposal of the box must be made in accordance with the existing environmental norms ATTE...

Отзывы: