7
【
LED Indicators
】
LED indictor light on the front panel of product, the function of each LED is described in the table as below.
System Indication LED
LED
State
Description
PWR
(P1, P2)
ON
Power is being supplied to
power input PWR input
OFF
Power is
not
being
supplied to power input
PWR input
RUN
ON/OFF System is not running
well
Blinking System is running well
Link/ACT
(1~16)
ON
Port connection is active
Blinking Data transmitted
OFF
Port connection is not
active
【
Installation
】
Before installation, confirm that the work environment meet the installation require, including the power needs and abundant space.
Whether it is close to the connection equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable scheme.
4. Power: 12~48VDC power input
5. Environment
:
working temperature -40
~
75
℃
Storage Temperature: -40
~
85
℃
Relative humidity 5%
~
95%
DIN-rail installation
In order to apply for industrial environments conveniently, IES6116 series adopts 35mm DIN-Rail installation, the installation steps
are as follows:
1.
Examine the DIN-Rail accessories
2.
Examine DIN Rail is firm or not and the position is suitable or not.
3.
Insert the top of the DIN-Rail into the slot just below the stiff metal spring.
4.
The DIN-Rail attachment unit will snap into place as shown below.