Intel
®
Server System R1000WF Product Family System Integration and Service Guide
58
3.10.2
Intel® Omni-path IFT Carrier Kit (iPC AWF1PFABKITP) – Installation
Kit Contents:
1 – Dual port IFT Carrier PCIe Add-in Card
1 – Internal Host Fabric Interface (HFI) Cable (CPU1)
1 – Internal Omni-Path Sideband Cable
2 – Fabric Processor Carriers
Intel Cable Kit
AXXCBL370IFPS1
required for dual fabric processor configurations.
1.
Install Fabric processor(s) on to the server board. See Section 2.4 for fabric processor installation
instructions.
2.
Install the internal Omni-path sideband cable to the matching connector on the IFT Carrier mezzanine
card (See letter “A”)
3.
Install the internal HFI cable to Port 1 of the IFT Carrier mezzanine card (See letter “B”)
4.
(Optional – For dual Fabric processor configurations) Install the second internal HFI cable to Port 2 of the
IFT Carrier mezzanine card (See letter “C”)
5.
Remove the Riser #2 bracket assembly from the system and install the IFT Carrier card to the add-in card
slot
6.
Route the HFI cable attached to Port 1 of the IFT Carrier Card to CPU #1
Omni-path Sideband Cable
Internal HFI Cable – IFT Card to CPU #1
Internal HFI Cable – IFT Card to CPU #2
C - Optional
B
A
Содержание R1000WF Series
Страница 2: ...Intel Server System R1000WF Product Family System Integration and Service Guide Blank Page ...
Страница 16: ......