PN
Warnings!
15kg
30kg
50kg
Please keep this document for future reference.
If the device is more than 15kg, at least 2 people are needed.
If the device is more than 30kg, at least 3 people are needed.
If the device is more than 50kg, at least 4 people are needed.
The cabinet, chassis or guide rails may cause serious
scratches, please be careful while handling.
When installing new servers into the cabinet in use, please
be aware of electric shock.
4U Server
Installation Guide
V1.0
●
When installing 4U or bigger servers, at least 4 people are needed or use the auxiliary equipment.
●
During the installation process, please do not block the vents on the server, especially the
vents on the front and rear of the server.
●
Please remove the protective film from the server surface before using.
●
Please leave a minimum of 15cm clearance on the front and rear sides of the server for proper
ventilation.
●
Please install air baffles in place prior to device installation, to make sure that the server can
get enough air flow, and to avoid air turbulence in the server room.
●
Servers are high-power electrical appliances, and they should be installed into dedicated
cabinets with vents or professional water-cooled cabinets, to prevent system failures
causedby overheating.
●
If it needs to install more than one device, please load them from the bottom to the top, and
load the heaviest items first.
●
Please note the cabinet’s load-bearing capacity, power supply capacity and heat dissipation
capacity, be sure not to install devices beyond the cabinet’s threshold capacity.
●
For the convenience of using the front and rear ports of the server and cabling, leave a
minimumclearanceof 70mm between the front end of the server and the inner side of the
cabinet’sfront door, and 150mm between the rear end of the server andthe inner side of the
cabinet’s rear door.