Warnings!
15kg
30kg
50kg
For devices ≥ 15kg, it requires at least 2 people.
For devices ≥ 30kg, it requires at least 3 people.
For devices ≥ 50kg, it requires at least 4 people.
Watch out for the scratches that may be caused by the cabinet,
chassis or rails.
Be aware of electric shock when installing the servers into the
cabinet in use.
Rack-Mounted Server
Installation Guide
V1.0
●
DO NOT block the vents on the server during installation, especially the vents on the
front and rear of the server.
●
Remove the protective film from the chassis before installing servers into the rack.
●
For proper ventilation, leave a minimum space of 15cm between two servers.
●
For easy access of the front and rear ports and cabling, leave a minimum space of
70mm between the front side of the server and the inner side of the cabinet’s front
door, and 150mm between the rear side of the server and the inner side of the
cabinet’s rear door.
●
Always keep the air baffles in place to ensure proper air flow and avoid air
turbulence in the server room.
●
Installation must comply with local and regional electrical regulations. To reduce the
risk of personal injury, fire, or damage to the server, DO NOT overload the AC supply
that provides power to the rack.
●
Servers can only be deployed in dedicated cabinets with ventilation holes or
specialized cooling cabinets to avoid server failure from overheating as they are high
power appliances.
●
In case of multiple-server deployment, always load from bottom to top and place the
heavier server on the lower bay.
●
DO NOT install devices beyond the cabinet’s load-bearing capacity, power supply
capacity and heat dissipation capacity.
Please keep this document for future reference.