Leg Extension
Cable
p/n 870-500-002
Pulley 11
Pulley 12
Pulley 13
The cable must go over
this plate or it will be
damaged.
Large ball end
STEP 10
A)
Install Pulley 11 and 13 with the M10* 45 bolts (94) and Pulley 12 with the M10*95 bolt
(97) and two 1” Step Spacers (46) as shown in the drawing. Tighten the hardware at this
time.
B)
On the Leg Extension Cam Assembly (48), remove the four flat head screws (109) and the
chrome Cam Plate (27). Next insert the large ball end of the cable into the recessed area
and reinstall the chrome Cam Plate with the four screws. Tighten the screws. Then feed
the other cable end between the two small pulleys (58), over the metal plate and down to
Pulley 11 as shown in the expanded drawing. Run the cable behind Pulley 11 then down
and under Pulley12 and then to the back of the gym. Be sure the cable goes between
Pulley 12 and the cable retainer rod welded inside the tube. You will finish routing it after
Step C.
C)
Now insert the Leg Extension Cam Assembly (48) into the Leg Extension Assembly (15)
with the selector number 5 at the top. Now while holding them together, place them
between the two plates of the Seat Base Frame (4) and assemble using the M12*95 bolt
(98), flat washer (87), and thin locknut (89). Tighten this bolt but do not over tighten as
the Leg Extension must be able to rotate freely.
D)
Now continue routing the cable by running it through the bottom of the Main Upright (2)
and under Pulley 13. You will finish with this cable in Step 10B.
PAGE 14
89
98
Содержание M5
Страница 7: ...ASSEMBLY INSTRUCTIONS PAGE 4 ...
Страница 26: ...877 738 1729 DECAL REFERENCE PAGE 23 ...
Страница 27: ...DECAL REFERENCE PAGE 24 ...