Chapter 2 Mechanical and Electrical Installation
- 18 -
Chapter 2 Mechanical and Electrical Installation
2.1 Installation Environment Requirements
■
Ambient temperature: -20℃ to +70℃
■
Install it in a place free from vibration.
■
Install it in a place free from direct sunlight, high humidity and condensation.
■
Install it in a place free from corrosive, flammable, or explosive gas.
■
Install it in a place free from oil dirt, heavy dust and heavy metal powder.
Oil dirt, heavy dust or heavy metal powder
Sunlight
Strong vibration
High
temperature
and humidity
Operating temperature: -20°C to
+
70°C
Flammable, explosive, or corrosive gas
Combustible material
Do not install the product on the surface of a
flammable object.
2.2 Group Control Board
2.2.1 Dimensions
The MCTC-GCB-B1 is the core component of the group control system. It has eight
digital input (DI) terminals and four digital output (DO) terminals.
The following figure shows the appearance and dimensions of the MCTC-GCB-B1.