background image

 Page 57

EN

Chapter 13 Systems

13.2 General Terms of Business of the company INOTEC GmbH

General terms and conditions of Inotec GmbH 

Valid from April 2021  

 

§ 1 
General, scope 

 
I.   All  offers,  deliveries  and  other  services  provided  by  INOTEC  GmbH  — 
including  in  the  future  —  are  exclusively  subject  to  these  general  terms  and 
conditions. 
Terms and conditions of the customer that deviate from or are not included in 
our  terms  and  conditions  are  not  recognised  unless  INOTEC  GmbH  has 
explicitly  agreed  to  their  validity  in  writing.  Counter-confirmations  by  the 
customer with reference to their terms and conditions of business or purchase 
are hereby rejected. 
 
II.   INOTEC  GmbH’s  general  terms  and conditions  of  leasing  apply  to  leasing 
services we provide. 
 

§ 2 
Product descriptions, application-related information, subject to 
change 

 
I.   Machine  descriptions  in  brochures,  technical  data  sheets,  etc.  do  not 
constitute 

quality 

guarantees. 

Application-related 

information 

and 

recommendations  that  INOTEC  GmbH  issues  verbally  and  in  writing  to 
support  the  customer  or  processor  are  based  on  our  current  level  of 
knowledge. They are non-binding and do not establish any contractual rights 
nor  any  secondary  obligations  from  the  purchase  contract,  unless  explicitly 
agreed otherwise.  
 
II.   We reserve the right to make design and material changes, provided that 
normal  use  of  the  delivery  item  or  use  required  under  the  contract  is  not 
significantly  or  adversely  affected  and  the  change  is  reasonable  for  the 
customer.  
 

§ 3  
Delivery period, assembly deadline 

 
I.   Agreed delivery periods start on conclusion of the contract, but not before 
the  customer  has  provided  the  necessary  documents  and  approvals  and  has 
fully  clarified  all  of  the  details  regarding  the  requested  execution  and  all 
technical  questions.  Compliance with  the  delivery  period  always  requires  the 
customer to meet its contractual obligations.  
 
II.   In the event of force majeure and any unforeseeable obstacles which were 
unknown  on  conclusion  of  the  contract,  where  we  are  not  responsible  for 
such  obstacles,  the  delivery  period  shall  be  extended  appropriately  — 
including within a delay — insofar as it is proven that such obstacles impacted 
the provision of the service owed. 
This also applies if these circumstances apply to sub-suppliers. We shall notify 
the customer of the start and end dates of such obstacles as early as possible. 
If the obstacle lasts for more than three months or if it is determined that this 
will  last  for  more  than  three  months,  both  we  and  the  customer  may 
withdraw from the contract.  
 
III.  If  we  have  agreed  the  time  of  delivery,  assembly  or  installation  with  the 
customer,  the  customer  is  obliged  to  take  all  precautions  at  their  place  of 
work to be able to carry out their planned work. In particular, the customer is 
obliged  to  provide  electrical  connections,  compressed  air  connections  and 
adequate lighting at the place of work. 
If the customer is responsible for the fact that we are unable to complete the 
planned work, are unable to complete it in full, or are unable to complete it 
within a reasonable period of time, the customer is obliged to compensate us 
for any damages incurred, and is particularly obliged to reimburse use for any 
additional  costs  incurred  as  a  result  of  additional  journeys  and  wasted 
working hours additionally required from our employees.  
The assembly deadline is met if assembly has been carried out for acceptance 
by  the  customer  by  the  deadline.  If  a  test  is  stipulated  by  the  contract,  the 
deadline  is  met  if  assembly  has  been  carried  out  for  execution  by  the 
deadline. If there are any delays as a result of force majeure or circumstances 
for  which  the  customer  is  responsible,  the  assembly  deadline  shall  be 
extended to a reasonable extent.  
 
IV. If  the  customer  has  demonstrably  suffered  damage  as  a  result  of  a  delay 
by  INOTEC  GmbH  as  an  assembly  company,  they  are  entitled  to  demand 
compensation  for  the  delay.  In  the  case  of  simple  negligence  on  the  part  of 
INOTEC GmbH, this is a fixed amount totalling 0.5% for each full week of the 
delay,  but  this  amount  shall  not  exceed  5%  of  the  value  of  the  part  of  the 
total  delivery  that  cannot  be  used  on  time  or  in  line  with  the  contract  as  a 
result of delayed assembly.  
 

§ 4  
Transportation, transfer of risk, packaging, partial deliveries 

 
I.   Unless  otherwise  agreed,  INOTEC  GmbH  shall  deliver  goods  carriage 
forward and uninsured to the named destination at the risk of the recipient. If 
there  are  any  damages  in  transit,  the  damage  must  be  confirmed  by  the 
carrier  before  the  goods  are  accepted.  If  carriage  paid  delivery  is  owed,  this 
only  applies  to  shipping  and  transportation  standard  in  the  industry. 
Additional  costs,  e.g.  for  express freight  requested  by  the  customer,  shall  be 
borne by the customer.  
 
II.   Unless  otherwise  agreed,  risk  for  shipping  transactions  transfers  to  the 
customer  as  soon  as  the  delivery  has  been  handed  over  to  the  person 
providing  transportation.  If  dispatch  is  not  possible  for  reasons  for  which 
INOTEC  GmbH  is  not  to  blame,  risk  transfers  to  the  customer  upon 
notification that the goods are ready for dispatch. If the customer collects the 
goods, risk transfers when the goods are handed over. 
 
III.  Unless  explicitly  agreed  otherwise,  INOTEC  GmbH  shall  provide  deliveries 
without packaging. 
 
IV. INOTEC  GmbH  is  entitled  to  partial  delivery and  partial  performance  to  a 
reasonable extent. 
 

§ 5 
Prices and payment, returns 

 
I.   Unless otherwise agreed, prices do not include packaging, transportation, 
insurance,  unloading,  installation,  assembly  and  commissioning,  namely  for 
delivery  ex  works  or  from  the  delivery  warehouse,  and  are  exclusive  of 
statutory  VAT at  the  respective  rate.  The  prices  quoted are  only valid  for  the 
respective  individual  order.  Assembly  is  billed  based  on  time  spent,  unless  a 
fixed rate has been explicitly agreed. 
 
II.   If contracts have an agreed delivery period of more than two months, both 
contracting parties may request a change in the agreed price if costs decrease 
or increase after the contract is concluded and the contracting parties cannot 
avoid  this,  particularly  if  such  decreases  or  increases  are  caused  by collective 
bargaining agreements or changes in the cost of materials. The price change 
must be limited to the amount required to compensate for the cost decrease 
or increase. A party is entitled to a similar price adjustment if delays arise for 
which  the  other  party  is  responsible  and  these  result  in  an  actual  delivery 
period of more than two months.  
 
III.  Unless  otherwise  agreed  (e.g.  when  the  invoice  is  sent),  payments  are  to 
be made immediately on delivery of the goods. Payment is only considered to 
have been made when INOTEC GmbH has the amount at its disposal. 
 
 
 
 
 
 

 

Granting  a  payment  term  once  or  several  times  only  applies  to  the  invoice 
amount  referred  to and  not  to  other  receivables (e.g.  receivables  from  other 
or future deliveries).  
 
IV.   If  the  customer  defaults  on  payment,  INOTEC  GmbH  may  demand 
statutory default interest as a minimum.  
 
V.   Offsetting payments or retaining payments where such retention equates 
to  offsetting  is  only  permitted  if  the  customer  has  legal  claims  that  are 
recognised  by  INOTEC  GmbH,  are  not  disputed,  are  pending  judgement  or 
have been established by law. 
 
VI.   Despite  any  of  the  customer’s  provisions  to  the  contrary,  INOTEC  GmbH 
is entitled to initially offset payments against their older debts and will notify 
the  customer  about  the  type  of  offsetting  that  has  taken  place.  If  costs  and 
interest  have  already  been  incurred,  INOTEC  GmbH  is  entitled  to  offset  the 
payment  against  the  costs  first,  then  against  the  interest  and  finally  against 
the main receivable. 
 
VII.  If  the  customer  defaults  on  acceptance  of  the  delivery  items  or  on 
payment,  INOTEC  GmbH  may  withdraw  from  the  contract  and/or  may 
demand  compensation  instead  of  performance  after  a  reasonable  grace 
period passes to no avail, where such a grace period is required by law and is 
set  by  INOTEC  GmbH.  If  a  compensation  claim  for  damages  is  asserted, 
INOTEC  GmbH  may  demand  compensation  at  the  amount  of  15%  of  the 
purchase price, without being required to provide evidence to compensate for 
lost  profit.  The  contracting  parties  are  free  to  provide  evidence  of  higher  or 
significantly lower actual damage. 
 
VIII. If  we  take  back  goods  after consultation  without  any  legal  obligation,  a 
credit  note  will  be  issued  that  totals  a  maximum  of  the  value  of  the  goods. 
With respect to the expenses incurred (loss of value, testing, cleaning, freight, 
packaging,  administrative expenses,  etc.),  we  reserve  the  right to  deduct  the 
working hours spent at current billing rates and/or a percentage of the value 
of  the  goods  from  the  credit  note,  and with  respect  to machine  returns, we 
reserve the right to carry out a leasing calculation using current leasing rates.  
 

§ 6 
Retention of title, extended retention of title 

 
I.   INOTEC  GmbH  retains  title  to  the  delivered  goods  until  all  receivables 
from  the  concluded  contract,  including  all  accessory  claims  (e.g.  exchange 
costs,  financing  costs,  interest)  have  been  met  in  full.  If  several  items  are 
delivered  for  a  total  price,  ownership  of  all  items  remains  reserved  until  full 
payment has been made. 
If a current account agreement has been made with the customer, retention 
of  title  exists  until  the  recognised  current  account  balance  has  been  paid  in 
full. 
If cheques or bills of exchange are accepted, fulfilment only occurs when the 
cheque  or  bill  of  exchange  has  been  cashed  and  INOTEC  GmbH  has  the 
amount at its disposal without any recourse risks. 
 
II.   The  customer  is  obliged  to  treat  the  goods  subject  to  retention  of  title 
with  care  and  to  immediately  notify  INOTEC  GmbH  in  the  event  of  seizure, 
confiscation,  damage  or  loss.  Any  breach  of  this  obligation  gives  INOTEC 
GmbH the right to withdraw from the contract. The customer shall bear all of 
the costs that have to be paid, particularly in the context of third-party action 
against  seizure  being  lifted  and,  if  necessary,  for  the  replacement  of  the 
delivery items, unless they can be recovered from third parties. 
 
III.   If the customer defaults in payment with respect to a not inconsiderable 
portion  of  its  obligations,  INOTEC  GmbH  is  entitled to  temporarily  take  back 
the goods subject to retention of title. Exercising the right of withdrawal does 
not  constitute  a  withdrawal  from  the  contract,  unless  INOTEC  GmbH  has 
explicitly  declared  withdrawal.  The  customer  shall  bear  any  costs  that  arise 
from  the  exercise  of  the  right  of  withdrawal  (in  particular  for  transportation 
and  storage)  if  INOTEC  GmbH  threatened  withdrawal  within  a  reasonable 
period  of  time.  INOTEC  GmbH  is  entitled  to  dispose  of the  goods  subject  to 
retention of title that have been taken back and to offset its claims with the 
proceeds,  provided  that  INOTEC  GmbH  has  previously  threatened  to  dispose 
of  them.  In  the  threat,  INOTEC  GmbH  must  have  set  the  customer  a 
reasonable deadline to meet their obligations. 
 
IV.   The customer hereby assigns to INOTEC GmbH the purchase price, wages 
or other receivables (including the recognised balance from a current account 
agreement  or,  in  the  event  of  insolvency  on  the  part  of  the  customer’s 
business partner, the ‘causal balance’ available) at the amount of the invoice 
value  for  the  goods  subject  to  retention  of  title  (inclusive  of  VAT)  from  the 
onward sale or further processing of the goods subject to retention of title, or 
which  arise  because  of  another  legal  reason  (insurance,  tort,  loss  of 
ownership  caused  by  connecting  the  delivery  item  to  a  property);  INOTEC 
GmbH  hereby  accepts  the  assignment.  INOTEC  GmbH  revocably  authorises 
the customer to collect receivables assigned to INOTEC GmbH for the account 
of INOTEC GmbH in their own name. This collection authorisation can only be 
revoked if the customer does not properly meet their payment obligations. In 
such a case and at the request of INOTEC GmbH, the customer must provide 
information  on  the  assigned  receivables  which  is  required  for  collection,  in 
addition  to  making  corresponding  documents  available  and  notifying  the 
debtor  of  the  assignment.  The  assignment  of  receivables  under  sentence  1 
serves to secure all receivables — 
including in the future — from the business relationship with the customer. 
 

§ 7 
Notice of defects, rights in the event of material defects 
 

I.   If  a  contract  is  established  with  a  consumer  (§13  of  the  Civil  Code 
[Bürgerliches  Gesetzbuch,  BGB]),  the  statutory  provisions  that  entered  into 
force on 01/01/2002 shall apply. 
 
II.   If the purchase is a commercial transaction for both parties, the customer 
must provide immediate notice of any defects in writing, provided that this is 
in line with the normal course of business. Notice of hidden defects, however, 
must  only  be  given  after  they  are  discovered;  otherwise  the  goods  are 
considered to be accepted. 
 
III.   Insofar  as  the  delivery  item  and/or  the  associated  assembly  service  is 
defective, the customer can either request that the defect is remedied (repair) 
or  that  an  item  free  of  defects  is  delivered  (replacement  delivery)  as 
supplementary performance, at INOTEC GmbH’s discretion, for a period of 12 
months from transfer of risk. If we are not prepared or are unable to carry out 
the  repair/replacement  delivery,  particularly  if  this  is  delayed  beyond  a 
reasonable  period  for  reasons  for  which  we  are  responsible,  or  if  the 
repair/replacement  delivery  fails  in  any  other  way,  and  if  further  attempts  at 
supplementary performance are unreasonable for the customer, they shall be 
entitled  to  withdraw  from  the  contract  or  to  reduce  the  purchase  price,  at 
their  discretion.  If  there  is  a  negligible  defect,  the  customer  may  only 
withdraw from the contract with our consent. 
 
IV.  No claims for material defects arise in the event of unsuitable or improper 
use  or  treatment  of  the  goods,  incorrect  assembly  or  commissioning  by  the 
customer or third parties, natural wear and tear (especially for wearing parts), 
unsuitable equipment or operating conditions, inadequate maintenance, etc.  
 
V.  If  the  defective  goods  are  third-party  products,  we  are  entitled  to  assign 
our claims for material defects against our sub-suppliers to the customer and  
 
 
 
 
 

 

to refer them to their (judicial) claim. A claim can only be made against us if  
claims  against  our  sub-suppliers  are  not  enforceable  despite  the  (judicial) 
claim  being  made  on  time,  or  if  the  claim  is  unreasonable  in  the  individual 
case. 
 

§ 8  
Limitation of liability 

 
I.    INOTEC GmbH shall be liable for intent and gross negligence. 
 
II.   INOTEC  GmbH  shall  only  liable  for  simple  negligence  if  essential 
contractual  obligations  (cardinal  obligations)  have  been  breached,  except  in 
the  case  of  injury  to  life,  limb  or  health.  Liability  is  limited  to  foreseeable 
damage typical for the contract. 
 
III.  Liability  for  indirect  and  unforeseeable  damage,  loss  of  production  and 
use, loss of profits, loss of savings and financial losses due to claims by third 
parties  is  excluded  in  the  case  of  simple  negligence,  except  in  the  case  of 
injury to life, limb or health. 
 
IV.  Further  liability  that  goes  beyond  this  contract  is  excluded,  regardless  of 
the  legal  nature  of  the  asserted  claim.  However,  the  above  limitations  or 
exclusions  of  liability  shall  not  apply  to  no-fault  liability that  is  mandatory  by 
law 

(e.g. 

in 

accordance 

with 

the 

Product 

Liability 

Act 

[Produkthaftungsgesetz]). 
 
V.  Insofar  as  liability  under  points  II  and  III  is  excluded  or  limited,  this  shall 
also  apply  to  the  personal  liability  of  INOTEC  GmbH’s  employees,  workers, 
representatives, bodies and vicarious agents. 

 

§ 9 
Fixed compensation for damages 

 
I.  If the buyer cancels the order before execution, INOTEC GmbH is entitled 
to demand 15% of the total order amount as compensation. 
 
II.  INOTEC  GmbH’s  right  to  claim  higher  damage  amounts  remains 
unaffected. 
 

§ 10 
Documents, demonstration equipment, property rights 

 
We  shall  retain  title  and  copyrights  to  drawings,  drafts,  cost  estimates  and 
other  documents  provided  by  us,  particularly  samples  and  demonstration 
equipment. Documents and items may not be reproduced or made accessible 
to third parties without our explicit, specified consent. 
 

§ 11 
Place of jurisdiction, applicable law 
 

I.   The law of the Federal Republic of Germany applies to these general terms 
and conditions and the entire legal relationship between INOTEC GmbH and 
the customer, excluding the UN Convention on Contracts for the International 
Sale of Goods (CISG). 
 
II.   If  the  customer  is  a  merchant  within  the  meaning  of  the  Commercial 
Code  (Handelsgesetzbuch),  a  legal  entity  under  public  law  or  a  special  fund 
under public law, the place of jurisdiction for all rights and obligations of the 
parties to the contract from any transaction — including those involving bills 
of exchange and cheque disputes — is Waldshut-Tiengen (Federal Republic of 
Germany). The same shall apply if the customer does not have a general place 
of  jurisdiction  in  Germany,  has  moved  their  domicile  or  usual  place  of 
residence outside of Germany after concluding the contract, or their place of 
residence  or  usual  place  of  residence  is  not  known  at  the  time  when  the 
action  is  filed.  However,  we  are  also  entitled  to  sue  the  customer  at  their 
general place of jurisdiction. 
 
 

INOTEC GmbH 

Daimlerstraße 9-11 
D-79761 Waldshut-Tiengen 
 
 
 
Managing Director: 
Manfred Schmidt 
Jörg Tetling 
Commercial Register: 
Freiburg District Court HRB 621 131 

Содержание inoCOMB Cabrio

Страница 1: ...EN Original Operating Manual Small Silo inoCOMB Cabrio Read this entire original operating manual before starting work ...

Страница 2: ...ed to you or in urgent cases contact us directly We work constantly to further develop our products and reserve the right to make changes for technical reasons relating to building legislation Yours faithfully INOTEC GmbH Legal notice Address INOTEC GmbH Daimlerstraße 9 11 79761 Waldshut Tiengen Germany Tel 49 0 7741 6805 666 Fax 49 0 7741 6805 665 Email info inotec gmbh com Web www inotec gmbh co...

Страница 3: ...l container 11 3 6 Mixer motor 11 3 7 Pump motor 11 3 8 Metering shaft 11 3 9 Mixing shaft 11 3 10 Pump shaft 11 3 11 Rotor Stator 12 3 12 Noise emission 12 3 13 Operating conditions 12 4 Assembly and function 12 4 1 Scope of delivery inoCOMB Cabrio 12 4 2 Functionality 12 4 3 Sequence of assembly 13 4 4 Components 14 4 4 1 Description of the components 14 4 4 1 1 Frame with pull out frame for pum...

Страница 4: ...13 Mixing shaft for inoPOWERMIX S L mixing tube 34 4 9 14 Metering shaft 34 4 9 15 Pump shaft for set D and Ü 35 4 9 16 Rotor Stator 35 4 9 17 Set D 36 4 9 18 Set Ü1 36 4 9 19 Set Ü2 37 4 9 20 Set RS 37 5 Transport and storage 38 5 1 Safety instructions for transport 38 5 2 Transport inspection 38 5 3 Damage report 38 5 4 Complaints 38 5 5 Packaging 38 5 6 Transporting the used machine in the vehi...

Страница 5: ...12 2 Dismantling 55 12 3 Disposal 55 13 Systems 56 13 1 EC declaration of conformity 56 13 2 General Terms of Business of the company INOTEC GmbH 57 13 3 Feeding and earthing 58 13 3 1 Circuit diagram Load circuits 01 59 13 3 2 Circuit diagram Load circuits 02 60 13 3 3 Circuit diagram Direction of rotation changeover 61 13 3 4 Circuit diagram Contactor control 62 13 3 5 Circuit diagram Sensors 63...

Страница 6: ...nual 1 3 1 Purpose of this operating manual The operating manual is used to provide information to the operating manager assembly fitters and machine operators on the construction site It contains important instructions for safe use optimum results and a long service life DANGER Risk of incorrect operation Failure to observe the operating manual could put the operator s life and health at risk and...

Страница 7: ...be fed with powdered material from sacks from one way containers with the inoFLEX Duo dry conveying unit from big bags with an attachment bonnet or with the big bag box Mono In the mixing phase a paste like product is created by adding water The material is pumped to the processing location by means of mortar hoses There it is applied to walls and ceilings with appropriate spray adhesive guns or a...

Страница 8: ... and or bursting con veyor hoses Before disconnecting the conveyor hoses make sure that the hoses are depressurised To do so check the pressure indicator on the mortar pressure gauge The pressure in dicator must display 0 bar Before opening the hose coupling let the small silo ino COMB Cabrio run in reverse to release any pressure To do this press the Reverse pump pushbutton until the pres sure di...

Страница 9: ...ctional ity of the machine Do not make any changes additions or conversions to the machine without first consulting INOTEC GmbH and obtaining its written approval Otherwise the op erating license will become void 2 2 4 Cleaning and maintaining the machine WARNING Cleaning and maintenance work can put the safety of operating staff at risk and impair the functionality of the machine 1 Switch off the...

Страница 10: ...rating personnel as well as property damage to the inoCOMB Cabrio or other assets 2 5 Responsibility of the operator Only use trained or instructed personnel to operate the inoCOMB Cabrio small solos Define employees responsibilities for operating setting up maintaining and servicing the machine clearly Only task untrained staff or individuals who have not re ceived any instruction with operating ...

Страница 11: ...ng on the consistency of the material observe the material manufacturer s instructions 3 3 Mortar pressure gauge Automatic shutdown 40 bar 3 4 Water measuring system Pressure being too low min 3 bar at 1 500 l h Pressure reducer ex works setting 2 5 bar Solenoid valve 24 V Supply line inch water pipe to be supplied by customer 3 5 Material container Filling quantity material con tainer approx 200 ...

Страница 12: ...0 l 15 bar Item no 10043991 _____________________________ For scope of delivery see accessories 4 2 Functionality The small silo inoCOMB Cabrio is used for mixing and con veying pumpable mineral or organic products materials up to approx 8 mm grain size Dry mortar screed material or floor levelling compounds pre mixed by the material manu facturer can be used The material hopper of the small silo ...

Страница 13: ...e shaft in the lower area of the pump hopper and insert it into the Rotex coupling of the drive shaft 4 Insert the suction flange into the opening provided on the pump hopper 1 Place the pump unit rotor stator 2 on the suction flange and connect the pump unit to the pump shaft 3 Then fit the assembly 4 pres sure flange with mortar pressure manometer and the hose coupling to the pump unit Fix the t...

Страница 14: ...to the socket provided on the side of the switching cabinet 10 Remove the green protective cap from the materi al hopper and secure the mixing tube to the material hopper with the two eccentric locks Make sure that the mixing shaft is properly connected to the metering shaft This sectional view shows the connection from the motor left to the metering shaft and from the metering shaft to the mixing...

Страница 15: ... of the switching cabinet 4 4 1 4 Water measuring system The water measuring system is firmly connected to the frame of the machine The connection for the external wa ter supply line min 3 4 is located on the water measuring unit The water supply button is also attached to the frame The water flow button and the needle valve are used to make a rough adjustment of the water supply on the water flow...

Страница 16: ... as the mixer is switched on the pushbutton lights up 4 5 1 3 Reverse pump If this pushbutton is pressed the pump runs in reverse e g if a stopper forms in the material hose 4 5 1 4 Probe On Off This switch turns the level probe in the pump hopper on and off 4 5 1 5 Pump speed The pump speed or the desired material flow rate is regulat ed with the potentiometer knob 4 5 1 6 Illuminated button Cove...

Страница 17: ...mixing metering and pump shafts Danger of death due to being pulled into the machine and crushed When the motors are running the metering shaft ro tates in the material hopper the mixing shaft in the mixing tube and the pump shaft in the pump hopper Do not reach into the rotating mixing or pump shaft Do not bring any objects into the rotating mixing or pump shaft 1 Before working on the mixing or ...

Страница 18: ...of property damage due to es caping water 1 Interrupt the external water supply by closing the water valve 2 In order to release the pressure approx 2 bar open the water drainage valve on the water measuring sys tem under the pressure reducer 3 Remove the hose from the external water supply 4 Do not point the water jet at other people or yourself NOTE Use an external site compressor for processing...

Страница 19: ... silo with bagged material high dust generation room height min 180 cm Material loading of the small silo with big bags via the at tachment bonnet hardly any dust formation room height min 500 cm Material loading of the small silo with big bags via two big bag boxes and the dry conveying unit inoFLEX Duo low dust room height min 180 cm Material loading of the small silo with two one way con tainer...

Страница 20: ...tem no 10043989 P Set RS Cabrio rotor stator R7 1 5 with clamping bar Ø 115 mm 50 l min 15 bar for e g coarse grained material such as grouted concrete Scope of delivery Suction flange pressure flange mortar pressure gauge rotor stator R7 1 5 with clamping bar coupling M part 50 2 IT Item no 10043991 P Attachment hood for inoCOMB Cabrio for direct filling with big bags without cover for filler hol...

Страница 21: ...e adapter for each vibrating unit Item no 10038995 P P P P Vibrator with vibrating bars for OWC and big bags The vibration unit is stuck directly into an OWC or big bag and secured with a tension belt For non flowing powder material in an OWC or big bag Prevents tunnel formation or bridges Scope of delivery Vibrating unit assembled on plate with vibration rods including 230 V connecting cable and ...

Страница 22: ...41544 10041545 10008346 010 10008346 011 P P P P P P P P P P P P P P P P P P P P P P P P Coupling reducer For connecting two mortar hoses or as a reduction in machine output 50 V piece 42 V piece 50 V piece 35 M piece 42 M piece 35 M piece Item no 10041187 10022100 10022097 P P P P P P P P P P P P Plaster piece with GEKA coupling For cleaning mortar hoses 50 M piece 35 M piece 42 V piece Item no 1...

Страница 23: ...eel steel special assembly lubricant spray 400 ml tin connecting coupling for compressor Geka claw coupling bench hammer 300 g hose clamp 1 2 and 3 4 clamp ing range Stanley FatMax tool box Item no 10043923 P P P P Pump shaft for set Ü with Rotex coupling without sprocket Pump shaft for set D with Rotex coupling without sprocket Sprocket for Rotex coupling Item no 10041876 10042437 10041878 P P P ...

Страница 24: ...lation quantity Number of parts in this position as they are installed in the original small silo inoCOMB Cabrio UQ Unit of quantity of this item Name Name of the spare part NOTE Use the order form at the end of this op erating manual to order spare parts 4 9 1 Overview of the individual assemblies of the small silo 1 5 2 4 6 3 Item Name 1 Frame rack with pull out frame for pump hopper material ho...

Страница 25: ...uantity UQ Name 1 10041407 1 Units Worm gear motor 4 kW 373 rpm 2 10006536 1 Units Three phase motor 4 kW for mixer 3 10006139 1 Units Motor plate with bolt and seal 4 10006141 1 Units Sponge rubber square profile for mixer motor 5 10006140 2 Units Dry bush with collar 6 10006138 1 Units Motor shaft with bell and feather key 7 10004148 2 Units Oil seal 55 x 80 x 10 ...

Страница 26: ...004962 1 Units M shape detent edged washer M12 16 10005452 1 Units Allen screw M 12 x 30 galvanised 17 10006354 1 Units Terminal board box for gear motor 18 10015178 1 Units Motor connection cable with CEE plug 19 10015262 1 Units CEE plug 5 x 16 4 9 3 Pump hopper 1 2 3 4 5 Item Item no Installation quantity UQ Name 1 10039224 1 Units Complete safety switch 1 1 10034395 1 Units Actuator for safety...

Страница 27: ...31 1 Units Straight M 6 grease nipple 6 10004154 1 Units White rubber seal 7 10022478 1 Units TW male part 8 10022476 1 Units TW protective cap 9 10016824 1 0 2 m Steel cable 2 mm 9 1 10018183 2 Units Ferrules 10 10006057 2 Units Stud bolts 10 1 10005332 2 Units Split pin 4 x 32 mm 11 10016544 2 Units M16 x 300 eyebolts 12 10005228 2 Units Collar nut Chain gear box 13 10006043 1 Units Chain wheel ...

Страница 28: ...3 10019580 1 Units Deep groove ball bearing 6309 4 10019581 1 Units 6309 Z deep groove ball bearing s 5 10004599 1 Units Retaining ring d 45 mm 6 10004598 1 Units Retaining ring d 100 mm 7 10006045 1 Units Spacer sleeve 8 10005457 4 Units Allen screw M8 x 25 9 10004978 4 Units Oval head screws M5 x 10 10 10005351 1 Units Screw M10 x 70 11 10004900 1 Units 10 5 mm washer 12 10004828 1 Units M10 nut...

Страница 29: ...1 4 IT 9 10006466 1 Units Pressure gauge 0 10 bar 1 4 below 10 10039020 1 Units Pressure reducer D06FN low pressure 10 1 10006464 1 Units Brass sieve cup with 1 4 hole 10 2 10006518 1 Units Replacement strainer for pressure reducer 11 10017912 2 Units Mini ball valve 1 4 IT ET 11 1 10004302 1 Units PE seal hard 18 8 x 13 5 x 2 12 10006463 1 Units Magnetic valve 2 2 way 1 2 24 V complete 13 1000647...

Страница 30: ...tem no Installation quantity UQ Name 1 10041987 1 Units Power supply unit 2 10041060 1 Units CPU control 3 10041061 2 Units Extension CPU 4 10041107 1 Units Coupling relay s 5 10041062 1 Units Relay 6 10041101 1 Units Level relay 7 10041117 1 Units Frequency inverter 8 10041074 2 Units Power contactor 9 10043194 1 Units Circuit breaker C25 3 fold 10 10043191 4 Units Circuit breaker B16 11 10041951...

Страница 31: ...ht side underside 1 2 3 4 5 1 2 3 6 4 5 7 8 9 1 Item Item no Installation quantity UQ Name Switching cabinet left side 1 10041077 1 Units Main switch 2 1 Units Remote control socket 2 1 10015618 1 Units Mounted housing 2 2 10015398 1 Units Socket insert 4 pole 2 3 10015613 1 Units Metal cover 3 10039975 1 Units Black mounted socket 4 10039976 1 Units Surface mounted socket outlet blue 5 10043951 1...

Страница 32: ... 1 Units Socket insert 6 pole 6 1 Units CEE mounting socket straight 7 1 Units CEE mounting socket straight 8 1 Units Attachment box for mortar pressure gauge 8 1 10015618 1 Units Attachment housing straight 8 2 10015398 1 Units Socket insert 4 pole 9 10015613 2 Units Metal covers unoccupied connections Item Item no Installation quantity UQ Name Switching cabinet underside 1 10044251 1 Units Air i...

Страница 33: ...s Lamp holder LED red 6 10044360 1 Units Indicator lamp blue complete 6 1 10044361 1 Units Lamp holder LED blue 4 9 11 Mixing tube inoPOWERMIX S Plus with mixing shaft and mixing tube cover 7 2 6 3 1 4 5 Item Item no Installation quantity UQ Name 10044030 1 Units Mixing tube inoPOWERMIX S Plus with mixing shaft and mixing tube cover 1 10044167 1 Units inoPOWERMIX PU inlay short with wide outlet 2 ...

Страница 34: ... shaft for inoPOWERMIX S for adhesive and reinforcement mortar 1b 10041033 1 Units Mixing shaft for inoPOWERMIX S with PU scraper for masonry mortar 1b 10044009 1 Units Mixing shaft for inoPOWERMIX L with PU scraper for masonry mortar 2 10040694 1 Units Allen screw 8 x 12 mm left hand thread 3 10040419 1 Units Splash guard washer 4 10044011 1 Units PU scraper for mixing shaft inoPOWERMIX S L 4 9 1...

Страница 35: ...out sprocket 3 10041878 1 Units Sprocket for Rotex coupling 4 9 16 Rotor Stator 1 3 5 7 2 4 6 8 Rotor stator depending on set and application Item Item no Installation quantity UQ Name 1 2 10022556 10022515 1 1 Units Units Set D Rotor D7 2 5 S Set D Stator D7 2 5 S 3 4 10041243 10041242 1 1 Units Units Set Ü1 Rotor 1R6 Set Ü1 Stator 1R6 maintenance free 5 6 10044018 10044019 1 1 Units Units Set Ü2...

Страница 36: ...Coupling M part 35 1 1 2 IT 1 pcs 4 9 18 Set Ü1 3 10 1 2 12 5 4 7 6 8 9 11 Item Item s Item name Quan tity 1 10006062 Suction flange for Ü50 stator 1 pcs 2 10041272 Pressure flange straight V2A for Ü 50 jacket 1 pcs 3 10041876 Pump shaft inoCOMB for Ü 50 jacket with Rotex coupling 1 pcs 4 10016799 Double nut M 16 spacer sleeve SHK 2 pcs 5 10004830 M16 nut 4 pcs 6 10041243 Rotor 1R6 tool steel hard...

Страница 37: ...m 9 10016799 Double nut M 16 spacer sleeve SHK 2 pcs 10 10004830 M16 nut 4 pcs 11 10041878 Sprocket for Rotex coupling 1 pcs 12 10042444 Metering shaft pitch 45 mm 1 pcs 4 9 20 Set RS 1 2 3 4 5 6 7 8 9 Item Item s Item name Quan tity 1 10042444 Metering shaft pitch 45mm 1 pcs 2 10041057 Suction flange R pump R jacket 1 pcs 3 10022887 Rotor R7 1 5 1 pcs 4 10023395 Stator R7 1 5 with clamping strip ...

Страница 38: ...ure of the recipient at the customer s premises 2 Have the transport damage confirmed by means of the driver s signature 3 Send one copy of the damage report to the transport company and another to Inotec GmbH 4 And clarify the possible ways in which the damage could be remedied with one of our service centres see second last page 5 4 Complaints Claims for compensation relating to transport damage...

Страница 39: ...play 0 bar Before opening the hose coupling let the small silo ino COMB Cabrio run in reverse to release any pressure To do this press the Reverse pump pushbutton until the pressure display on the mortar pressure gauge shows 0 bar Pushbutton Reverse pump Use only conveyor hoses which are permissible with an operating pressure of 40 bar and a burst pressure of 120 bar and are in a technically perfe...

Страница 40: ...o the plug connection attached to the base frame 3 2 4 5 6 1 NOTE Depending on the set the machine is equipped with different rotors stators 6 3 Mounting the metering and mixing shaft with mixing tube 1 Unplug the motor 2 from the socket on the side of the switching cabinet Unlock the eccentric lock 3 that connects the motor to the material hopper and fold the motor away to the side 4 1 2 3 4 2 Pu...

Страница 41: ...water Follow the instructions of the manufacturer of the drying material NOTE To ensure sufficient water pressure in dependent of the pressure of the supply line we rec ommend the use of a booster pump WARNING Water jet Risk of injury and risk of property damage due to es caping water 1 Interrupt the external water supply by closing the water valve 2 In order to release the pressure approx 2 bar o...

Страница 42: ... 2 3 litres of milk of lime mortar slurry or wallpaper paste into the delivery hose as pre lubrica tion and then connect it to the mortar coupling 3 Start the mixer motor by pressing the Mixer ON but ton and fill the pump hopper up to the upper probe rod 4 Then start the pumping process by pressing the Pump button The button of the pump lights up green and the button of the mixer flashes ready mes...

Страница 43: ... long term lung damage or other adverse health ef fects The machine operator or people working in the dust area must each wear a dust mask when cleaning the machine Find out about the technical rules for hazardous sub stances TRGS 559 Mineral dust on the homepage of the German Social Accident Insurance Institution www bgbau de Warning Risk of injury posed by powdery and paste like material When fi...

Страница 44: ...sting it on the needle valve of the water fitting Material too runny Reduce the water supply by re adjusting it on the nee dle valve of the water fitting NOTE Ensure that the change in consistency may take some time to become noticeable depend ing on the length of the hose approx 20 seconds per 15 m hose length Therefore adjust the water supply at the needle valve only by turning it a small amount...

Страница 45: ...e machine and crushed When the motors are running the metering shaft ro tates in the material hopper the mixing shaft in the mixing tube and the pump shaft in the pump hopper Do not reach into the rotating mixing or pump shaft Do not bring any objects into the rotating mixing or pump shaft 1 Before working on the mixing or pump shaft disconnect the external power supply main switch off Only loosen...

Страница 46: ...out at the end of the mortar hose 6 Stop the machine by pressing the double pushbutton Pump Reset 0 7 Now uncouple the quick coupling on the hose connec tion on the mortar pressure gauge by opening the two cam levers Put a sponge ball into the hose and then reconnect the mortar hose 8 Fill some more water into the pump hopper and start the machine by pressing the double pushbutton Pump Reset I In ...

Страница 47: ...he mixing tube frame with the two eccentric locks At the end of work place the cleaned mixing tube back into the pump pull out frame Close the mixing tube receptacle with the green cover 1 2 3 22 For possible cleaning of the material hopper residue emptying pull the plug of the motor 1 out of the socket on the side of the switching cabinet 23 Unlock the eccentric lock 2 that connects the motor to ...

Страница 48: ...mp hopper Do not reach into the rotating mixing or pump shaft Do not bring any objects into the rotating mixing or pump shaft 1 Before working on the mixing or pump shaft disconnect the external power supply main switch off Only loosen the screw of the protective grids when the machine is switched off 2 Pull out the mains plug 3 Secure the machine against unexpectedly being switched back on DANGER...

Страница 49: ...et cover all the open ings that water must not penetrate into for safety and functional reasons 5 After cleaning remove all the covers which were at tached to protect against the water 11 1 Maintenance plan Have the machine inspected at a specialist workshop or at an INOTEC service centre Once a year Recommended Electrical inspection DGUV V3 by a qualified electri cian or at an INOTEC service cent...

Страница 50: ...cking and remedying the fault or contact the Inotec Service team see the address list for INOTEC service centres at the end of the document or call the INOTEC service hotline on 49 7741 6805 777 WARNING Malfunctions can jeopardise the safety of the the safety of operating staff at risk and impair the functionality of the machine Proceed as follows where a fault occurs 1 Cut off the power supply in...

Страница 51: ...e has tripped Check the RC fault indicator on the switching cabinet In the event of a fault in the frequency inverter or if the RCD or the fuse is tripped the cover grille warning light lights up red After eliminating the fault acknowledge the warning light with the red button at the Pump On switch Reset Machine operator Have the engines checked Have the fault remedied if necessary Service technic...

Страница 52: ...tor checked and replaced with a new mo tor if necessary Have the electrical control checked and repaired if necessary Service technician qualified electrician Excessively high deliv ery pressure Reduce the length of the hose Machine operator Foreign matter in the metering or mixing shaft Switch off the machine and pull out the mains plug Check whether there is a foreign body or hardened material i...

Страница 53: ...ust be dismantled Clamp the stator in a vice turn the rotor anticlockwise out of the jacket and remove the plugger Machine operator Worn or poorly lubri cated hoses Run the machine in reverse to reduce the mortar pressure Check the mortar pressure on the mortar pressure gauge If the pressure gauge shows 0 bar switch off the machine and pull out the mains plug Remove the mortar hose remedy the mate...

Страница 54: ...by adjusting it on the needle valve of the water fitting Machine operator Con sistency fluctua tions The material supply or water quantity is fluctuating Switch off the machine and pull out the mains plug Check the mixing shaft and the pump shaft for adhering ma terial and clean and dry them before reinserting Check the water inlet screen clean the water screen if nec essary Check the water pressu...

Страница 55: ...ine at 49 7741 6805 777 DANGER Electrical voltage Danger of death due to electric shock When switched on electrical components can cause uncontrolled movements and lead to serious injury 1 Switch the machine off To do this turn the red rotary switch to the horizontal position 0 2 Pull out the mains plug and finally disconnect the ma chine from the electrical supply 12 2 Dismantling Clean and disma...

Страница 56: ...s of the EC Directive 2006 42 EC This declaration will become void in the event of any modification made to the machine without our approval Designation of the unit inoCOMB Cabrio Machine model Small silo Item number 10042612 Applied harmonised standards DIN EN 12100 Safety of machinery DIN EN 60 204 1 Electrical equipment of machines Part 1 general requirements DIN EN 13857 Safety of Machinery Sa...

Страница 57: ...ht to deduct the working hours spent at current billing rates and or a percentage of the value of the goods from the credit note and with respect to machine returns we reserve the right to carry out a leasing calculation using current leasing rates 6 Retention of title extended retention of title I INOTEC GmbH retains title to the delivered goods until all receivables from the concluded contract i...

Страница 58: ...age 58 EN Chapter 13 Systems 13 3 Feeding and earthing Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen L3 2 L2 2 L1 2 Q4 Q3 L L G1 R3 L2 P2 N L2 L1 P1 L3 L2 L1 F4 F3 F2 PE N 1 L3 L2 Q1 F1 Q2 L1 XS1 ...

Страница 59: ...Page 59 EN Chapter 13 Systems 13 3 1 Circuit diagram Load circuits 01 Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen Q5 M1 E1 F7 F6 L1 2 PE N 1 L3 2 L2 2 L1 2 L2 2 L3 2 N 1 PE MV F5 ...

Страница 60: ...Page 60 EN Chapter 13 Systems 13 3 2 Circuit diagram Load circuits 02 Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen Q7 F10 M6 K3 Q6 PE N 1 L3 2 L2 2 L1 2 L2 2 L3 2 N 1 PE L1 2 F9 M5 ...

Страница 61: ...ion changeover Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen H1 Q3 A3 13 5 Steuerung ein Q3 A2 12 5 Bestriebsbereit Pumpe Ein 11 5 A1 I1 Pumpe Aus 12 5 A2 I5 Netzuberwachung 11 5 A1 I7 S2 Q4 Q3 Q4 P2 K2 L L K2 Q3 S1 L L P1 Steuerung ein Netzüberwachung Phasenfolge ...

Страница 62: ...2 12 5 Umrichter Storung K3 Q6 A1 Q0 Q1 Q2 Q0 Q1 Q2 Q7 Ruttler ein 12 5 A2 Q0 Wasserdruck 12 5 A2 Q1 H2 Wasserdruck 12 5 A2 Q1 H3 Morteldruck 13 5 A3 Q1 H5 Storung Pumpe oder Abdeckgitter offen 13 5 A3 Q2 H6 Wasserventil Wasserpumpe ein Mischer ein Rüttler ein Wasserdruck Fernbedienung Mörteldruck Störung Pumpe oder Abdeckgitter offen T1 MA ...

Страница 63: ...tr 9 11 D 79761 Waldshut Tiengen Fernbedienung 11 5 A1 I2 L L L L S4 B1 Morteldruck 11 5 A1 I3 K1 Mortelniveau 11 5 A1 I4 Wasservorlauf 12 5 A1 I5 Druckwachter Wasser 12 5 A1 I6 S5 B2 X2 A1 PE PE A2 COM X1 X2 MIN MAX DOLD MK9151 12 K1 min max COM Mörteldruck Blindstecker Niveaurelais ...

Страница 64: ...er 13 Systems 13 3 6 Circuit diagram Operating switch Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen I2 A2 12 5 Sonde I1 A2 12 5 Mischen L L I0 A2 12 5 Mischen S6 S6 S8 Aus Ein Aus H8 Q0 A3 13 5 Mischen Ein L L ...

Страница 65: ...5 EN Chapter 13 Systems 13 3 7 Circuit diagram Pump Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen V1 L1 PE N 1 L3 L2 F31 3 T1 M7 A1 S7 R2 S211 YASKAWA PE L L T1 MA Pumpe Rückwärts Abdeckgitter L L L L ...

Страница 66: ...resse Querverweis NLC 055 024D 08I 04QRD 05A Starttaste S2 14 6 4C 14 2C Fernbedienung S4 14 8 1C Mörteldruck B1 12 8 2C Mörtelniveau K1 12 8 3C Wasservorlauf X2 S5 14 8 4C Druckwächter Wasser X2 S5 24 8 5C Netzüberwachung P2 12 6 2C Versorgung Nano 14 1C 14 2C 14 2C Wasserventil Wasserventil Wasserpumpe ein Wasserpumpe ein Mischer ein Mischer ein Pumpe Vorwärts Pumpe Vorwärts 4Y1 x1 Q5 A1 Q6 A1 T...

Страница 67: ...tal I O PHOENIX CONTACT 2 1 A2 NLC IO 06I 04QTP 01A H1 x1 H2 x1 Betriebsbereit Fernbedienung aktiv Wasserdruck Rüttler ein 14 4C Querverweis Symbolische Adresse Funktionstext Adresse 2 1 6 3C S1 22 Stoptaste 7 8C T1 MA Umrichter Storung 9 2E S6 2 Mischen 9 2E S6 4 Automatik 9 3E S6 6 Pumpen 14 4C 14 4C 14 4C Q7 A1 H3 x1 ...

Страница 68: ...tr 9 11 D 79761 Waldshut Tiengen A3 1 2 PHOENIX CONTACT Digital I O NLC IO 06I 04QTP 01A H6 x1 14 6C 14 6C 14 6C 1 2 Adresse Funktionstext Symbolische Adresse Querverweis 14 3C Mörteldruck Storung Pumpe oder Abdeckgitter Steuerung ein H5 x1 K2 A1 7 7D 7 8D 6 4D Mischer Ein H8 x1 9 5D ...

Страница 69: ...Page 69 EN Chapter 13 Systems 13 3 11 Circuit diagram Nano 04 Inotec GmbH Daimler Str 9 11 D 79761 Waldshut Tiengen PE L L PE L L 2 1 A1 NLC 055 024D 08I 04QRD 05A 11 5 C 11 5 B A2 12 5 C A3 13 5 D ...

Страница 70: ...customer Consultant Date Number Item no Item name Our General Terms of Business Delivery and Payment apply The customer has been made aware of these terms and agrees to the application of the same All goods shall be owned by us until we receive complete payment pursuant to Section 449 of the German Civil Code ...

Страница 71: ... Terms of Business 57 I Installation 39 Intended use 7 L Locations 72 M Maintenance plan 49 Mixing unit metering shaft and mixing tube with mixing shaft 17 N Notices on the machine 9 O Operating modes 19 Operation use 44 Order form 70 P Packaging 38 Personal protective equipment PPE 10 Personnel qualification 10 Pump unit pump motor pump shaft rotor stator and mortar pressure gauge 17 R Responsibi...

Страница 72: ... sales partner English language 72 INOTEC GmbH Headquarter Daimlerstraße 9 11 79761 Waldshut Tiengen Germany Phone 49 7741 6805 675 Fax 49 7741 6805 665 E Mail j tetling inotec gmbh com Wherever you are we re there too ...

Страница 73: ...uct range Delivery pumps Mixing pumps Mixers Delivery systems OWC technology Silo technology Airless devices Cutters Grinders One handed guns Accessories spare parts Waste water systems Tillage Power tools electrical appliances Compressed air compressors Heaters air dehumidifiers high pressure cleaners ...

Отзывы: