
ABW2011IQM01_C - Installation and Operation Manual
13. Shutting down the unit
This section describes the procedure to shut down the unit. If you wish to work inside the unit, you must carry out
these instructions in the order shown here to remove the power.
1. If there is an active charge process, finalize the charge session.
2. In the case of a unit without protections, disconnect the power from the outside. If the unit has
protections, open it and disconnect the main Q1 switch.
3. Wait 10 minutes for the internal capacitances to discharge, the hot parts which may cause burns to cool
and the fan blades to stop turning.
4. Open the unit and, using the appropriate PPE, make sure there is no voltage in the AC feed or the switch
output in the event the charging point includes one.
5. Signal cut-off point with a sign reading ¨
Caution no switching…
¨. If necessary, rope off the work area.
46
Shutting down the unit
Ingeteam
Содержание INGEREV FUSION Street FW1AW
Страница 3: ...ABW2011IQM01_C English EN Espa ol ES Fran ais FR Italiano IT 3 Ingeteam...
Страница 17: ...ABW2011IQM01_C Installation and Operation Manual EN ES FR IT 80 59 63 30 17 Unit description Ingeteam...
Страница 61: ...ABW2011IQM01_C Manual de instalaci n y uso EN ES FR IT 80 59 63 30 61 Descripci n del equipo Ingeteam...
Страница 105: ...ABW2011IQM01_C Manuel d installation et usage EN ES FR IT 80 59 63 30 105 Description de l appareil Ingeteam...
Страница 149: ...ABW2011IQM01_C Manuale d installazione e uso EN ES FR IT 80 59 63 30 149 Descrizione del dispositivo Ingeteam...
Страница 181: ...Notes Notas Remarques Note...
Страница 182: ...Notes Notas Remarques Note...
Страница 184: ...ABW2011IQM01_C 10 2020 Ingeteam Power Technology S A www ingeteam com...