5. Preparation for installing the unit
When deciding the location of the unit and planning your installation, you must follow a set of guidelines based on
the specifications of the unit. These guidelines are summarized in this chapter.
5.1. Environment
•
These units can be installed indoors and outdoors.
•
Place the units in a place which is accessible for installation and maintenance work and which permits
use of the keyboard and the reading of the front indicator LEDs.
•
Avoid corrosive environments that may affect the proper operation of the inverter.
•
Never place any object on top of the unit.
•
Do not expose the inverters to direct sunlight.
•
Do not install the units in inhabited rooms. The inverter produces a slight buzz when in operation.
•
If more than one inverter is installed, make sure the hot air extraction of one does not interfere with the
correct ventilation of another.
61
Preparation for installing the unit
Ingeteam
ABE2011IQM01_B - Installation and Operation Manual
DE
EN
ES
FR
IT
PT
Содержание INGECON SUN 1Play 2.5TL
Страница 3: ...iii Ingeteam ABE2011IQM01_B Deutsch DE English EN Espa ol ES Fran ais FR Italiano IT Portugu s PT...
Страница 48: ...Anmerkungen Notes Notas Remarques Note Notas...
Страница 90: ...Anmerkungen Notes Notas Remarques Note Notas...
Страница 132: ...Anmerkungen Notes Notas Remarques Note Notas...
Страница 258: ...Anmerkungen Notes Notas Remarques Note Notas...
Страница 260: ...Ingeteam Power Technology S A www ingeteam com ABE2011IQM01_B 04 2015...