background image

51984144

Edition 6

May 2014

Save These Instructions

Air Paving Breaker

MX60 & MX90

Maintenance Information

Содержание MX Series

Страница 1: ...51984144 Edition 6 May 2014 Save These Instructions Air Paving Breaker MX60 MX90 Maintenance Information ...

Страница 2: ...fill plug 21 from the backhead 3 and the oil fill plug o ring 300 5 Remove the throttle lever 10 from the housing plug 6 6 Remove the backhead o ring 305 from the housing plug 6 7 Using a pair of adjustable pliers pull the housing plug 6 out of the housing bore 8 Remove the housing plug o rings 315 from the housing plug 9 If damaged or dirty remove the filter 20 from the housing plug 6 10 Using th...

Страница 3: ...e slot in the housing 1 and the housing plug 6 17 Place the throttle lever 10 into the grooves of the housing plug 6 and throttle valve kit 11 18 Install the backhead 3 onto the top of the housing and attach with backhead bolts 205 and backhead washers 400 Torque the bolts to 140 ft lbs 190 Nm 19 If the oil fill plug 21 was removed from the backhead 3 install a new oil fill plug o ring 300 and scr...

Страница 4: ...kink or make sharp bends 1 Air supply line too long 2 As a general rule keep the air supply line under 50 ft 15 m 2 Diameter of air supply line too small 3 A 3 4 in 19 1 mm diameter air supply is recommended for the breaker 3 Freezing at exhaust ports Excessive moisture in the air supply line 1 Install moisture traps in the air supply line or add anti freeze lubricant directly through the air inle...

Страница 5: ... Protect the tool from dirt when idle 2 Fogging Excessive moisture in the air supply line 1 Blow out air lines If moisture traps are installed in the air supply line drain the moisture 1 Over lubrication 2 Clean lubricating oil reservoir and adjust for proper rate of feed 2 Related Documentation For additional information refer to Product Safety Information Manual 04581450 Product Information Manu...

Страница 6: ... 51984144_ed6 Maintenance Records Date Run Time Hours Work Performed Qty Work By ...

Страница 7: ...51984144_ed6 Date Run Time Hours Work Performed Qty Work By ...

Страница 8: ... 51984144_ed6 Date Run Time Hours Work Performed Qty Work By ...

Страница 9: ...Notes ...

Страница 10: ...Notes ...

Страница 11: ...Notes ...

Страница 12: ...ingersollrandproducts com 2014 Ingersoll Rand ...

Отзывы: