
Condensate drain.
NO
TICE
INGERSOLLrAND
®
Lift here
.
NO
TICE
INGERSOLLrAND
®
NOTICE
Motors MUST be greased
periodically
. See Operators
Manual for procedure.
39570098
39540273
NO
TICE
For detailed
regulation adjustment
instructions ref
er
to Operator
s/
Instruction Man
ual.
INGERSOLLrAND
®
39540208
39541081
39570098
NO
TICE
T
o obtain satisf
actor
y compressor
oper
ation and maintenance a
minim
um of 3 f
eet clear
ance on 3
sides is required 3-1/2 f
eet is
required in front of the control panel
(or minim
um required b
y latest
National Electr
ical code or applicab
le
local codes).
Ref
er to the Instr
uction / Oper
ators
Man
ual bef
ore perf
or
ming an
y
maintenance
.
INGERSOLLrAND
®
39540158
Condensate drain.
NO
TICE
INGERSOLLrAND
®
39541081
6
DANGER
!
Discharge air
.
Can contain carbon monoxide or
other contaminants. W
ill cause
severe injury or death.
Do not breathe this air
.
INGERSOLLrAND
®
39557236
RIGHT
SIDE VIEW
Содержание EP 20 SE
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 48: ...46 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39838388 REV 01 ...
Страница 49: ...47 8 2 ELECTRICAL SCHEMATIC STAR DELTA 39851985 REV 01 ...
Страница 50: ...48 8 3 ELECTRICAL SCHEMATIC FULL VOLTAGE REMOTE MOUNTED STARTER 39845029 REV 01 ...
Страница 51: ...49 NOTES ...
Страница 52: ...50 8 4 FOUNDATION PLAN ENCLOSED Continued 39838750 REV 02 ...
Страница 53: ...51 8 4 FOUNDATION PLAN ENCLOSED 39838750 REV 02 ...
Страница 54: ...52 8 4 FOUNDATION PLAN UNENCLOSED Continued 39848171 REV 02 ...
Страница 55: ...53 8 4 FOUNDATION PLAN UNENCLOSED 39848171 REV 02 ...
Страница 56: ...54 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION Continued 39848189 REV 02 ...
Страница 57: ...55 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION 39848189 REV 02 ...
Страница 62: ...60 8 11 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 63: ...61 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 64: ...62 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 65: ...63 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 66: ...64 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 67: ...65 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 68: ...66 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 69: ...67 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 70: ...68 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...