42
5.19 COOLANT HOSES
The flexible hoses that carry coolant to and from the oil
cooler may become brittle with age and will require
replacement. Have your local Ingersoll-Rand distributor
check them every 2 years.
Ensure the compressor is isolated from the
compressed air system by closing the isolation valve
and venting pressure from the drip leg.
Ensure the main power disconnect switch is locked
open and tagged.
Removal
Remove enclosure panels.
Drain coolant into a clean container. Cover the container
to prevent contamination. If the coolant is contaminated,
a new charge of coolant must be used.
Hold fitting securely while removing hose.
Installation
Install the new hoses and reassemble the package by
reversing the disassembly procedure. Start the
compressor and check for leaks.
5.20 AIREND DISCHARGE HOSE
The flexible hose from the airend discharge to separator
tank may become brittle with age and require
replacement. Check this hose as per the maintenance
schedule in Section 5.1.
Removal
Ensure the compressor is isolated from the
compressed air system by closing the isolation valve
and venting pressure from the drip leg.
Ensure the main power disconnect switch is locked
and tagged.
Disconnect hose nut from piping at each end of
discharge hose and remove. Hold fittings securely while
removing hose.
Содержание EP 20 SE
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 48: ...46 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39838388 REV 01 ...
Страница 49: ...47 8 2 ELECTRICAL SCHEMATIC STAR DELTA 39851985 REV 01 ...
Страница 50: ...48 8 3 ELECTRICAL SCHEMATIC FULL VOLTAGE REMOTE MOUNTED STARTER 39845029 REV 01 ...
Страница 51: ...49 NOTES ...
Страница 52: ...50 8 4 FOUNDATION PLAN ENCLOSED Continued 39838750 REV 02 ...
Страница 53: ...51 8 4 FOUNDATION PLAN ENCLOSED 39838750 REV 02 ...
Страница 54: ...52 8 4 FOUNDATION PLAN UNENCLOSED Continued 39848171 REV 02 ...
Страница 55: ...53 8 4 FOUNDATION PLAN UNENCLOSED 39848171 REV 02 ...
Страница 56: ...54 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION Continued 39848189 REV 02 ...
Страница 57: ...55 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION 39848189 REV 02 ...
Страница 62: ...60 8 11 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 63: ...61 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 64: ...62 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 65: ...63 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 66: ...64 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 67: ...65 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 68: ...66 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 69: ...67 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 70: ...68 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...