
35
5.10 COOLANT
■
SSR Ultra Coolant (Standard Factory Fill)
■
SSR H1-F Food Grade (Optional)
SSR Ultra Coolant is a polyglycol base coolant. Change
Ultra Coolant after every 8000 hours or every two years,
whichever comes first.
SSR Food Grade Coolant is a polyalphaolefin base
coolant. Change after every 1000 hours or every 6
months whichever comes first. Do not operate unit
beyond this 1000 hour lubricant change interval, as
lubricant degradation will occur.
Items Required
In addition to the tools normally found in any reasonably
equipped serviceman’s toolbox, the following items
should be available at the work site:
1) Suitable drain pan and container to hold lubricant
drained from unit.
2) A quantity of proper lubricant sufficient to refill the
compressor.
3)
A minimum of one replacement coolant filter element
of the proper type for the unit to be worked on.
There is a coolant drain valve on each compressor. It is
located on the bottom of the separator tank.
The coolant should be drained soon after the compressor
has been shut down. When the coolant is hot, the
drainage will be more complete and any particles in
suspension in the coolant will be carried out with the
coolant.
Hot coolant can cause severe injury. Use care when
draining separator tank.
To drain the unit, place drain pan under drain valve.
Open drain valve to start drainage. After draining is
complete, close drain valve.
After the unit is drained and a new coolant filter element
is installed, refill the system with fresh coolant through
the filler cap on the side of the separator tank. Bring the
receiver level of coolant up to the top of the sight glass.
Replace the fill cap. Start the compressor and allow it to
run unloaded for a short time. The correct coolant level is
at the top of the sight glass with the unit running in the
“LOADED” mode. If the level is not near the midpoint,
stop the compressor and allow all pressure to relieve
from the system. Open the fill cap and add more coolant.
Tank Only ............................ 0.75 gallons (2.8 liters)
Complete System .............. 1.70 gallons (6.4 liters)
WARNING
!
Hot coolant can cause severe injury.
Use care when near this area.
NOTICE
Filler Cap.
Use only recommended
coolant.
Read instruction book
before servicing.
39543921
Replace the fill cap. Start the compressor and allow it to
run unloaded. The coolant level should now be near the
midpoint of the sightglass.
DO NOT OVERFILL THE MACHINE. Over filling will
affect separation and carryover down stream.
Содержание EP 20 SE
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 48: ...46 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39838388 REV 01 ...
Страница 49: ...47 8 2 ELECTRICAL SCHEMATIC STAR DELTA 39851985 REV 01 ...
Страница 50: ...48 8 3 ELECTRICAL SCHEMATIC FULL VOLTAGE REMOTE MOUNTED STARTER 39845029 REV 01 ...
Страница 51: ...49 NOTES ...
Страница 52: ...50 8 4 FOUNDATION PLAN ENCLOSED Continued 39838750 REV 02 ...
Страница 53: ...51 8 4 FOUNDATION PLAN ENCLOSED 39838750 REV 02 ...
Страница 54: ...52 8 4 FOUNDATION PLAN UNENCLOSED Continued 39848171 REV 02 ...
Страница 55: ...53 8 4 FOUNDATION PLAN UNENCLOSED 39848171 REV 02 ...
Страница 56: ...54 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION Continued 39848189 REV 02 ...
Страница 57: ...55 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION 39848189 REV 02 ...
Страница 62: ...60 8 11 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 63: ...61 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 64: ...62 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 65: ...63 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 66: ...64 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 67: ...65 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 68: ...66 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 69: ...67 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 70: ...68 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...