
29
5.4 SHEAVE ALIGNMENT
Any degree of sheave misalignment will result in a
reduction of belt life.
Misalignment of sheaves should not exceed
1/16”(1.6mm).
Parallel misalignment occurs when the driven shafts are
parallel, but the two sheaves lie in different planes.
Angular misalignment occurs when the two shafts are
not parallel.
Align Sheaves
An easy and effective method of checking alignment in
both directions between the driver and driven sheaves
utilizes an accurate straight edge.
Lay the straightedge across the face of the driver
(motor) sheave and check alignment of the driven
(airend) sheave. Then lay the straightedge across the
driven sheave and check that the driver sheave is
aligned.
Alignment should be within 1/16” (1.6mm) maximum
when measuring the gap between the straightedge and
the rim of the opposite sheave in each direction.
This alignment is factory set and should only require
resetting if the drive motor or airend is removed. (For
example, motor or airend replacement).
AIREND
MOTOR
STRAIGHT EDGE
1/16" MAX
AIREND
MOTOR
STRAIGHT EDGE
1/16" MAX
PARALLEL MISALIGNMENT
ANGULAR MISALIGNMENT
1/16” (1.6mm) MAX.
1/16” (1.6mm) MAX.
STRAIGHTEDGE
STRAIGHTEDGE
Содержание EP 20 SE
Страница 18: ...16 FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION ...
Страница 48: ...46 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC FULL VOLTAGE 39838388 REV 01 ...
Страница 49: ...47 8 2 ELECTRICAL SCHEMATIC STAR DELTA 39851985 REV 01 ...
Страница 50: ...48 8 3 ELECTRICAL SCHEMATIC FULL VOLTAGE REMOTE MOUNTED STARTER 39845029 REV 01 ...
Страница 51: ...49 NOTES ...
Страница 52: ...50 8 4 FOUNDATION PLAN ENCLOSED Continued 39838750 REV 02 ...
Страница 53: ...51 8 4 FOUNDATION PLAN ENCLOSED 39838750 REV 02 ...
Страница 54: ...52 8 4 FOUNDATION PLAN UNENCLOSED Continued 39848171 REV 02 ...
Страница 55: ...53 8 4 FOUNDATION PLAN UNENCLOSED 39848171 REV 02 ...
Страница 56: ...54 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION Continued 39848189 REV 02 ...
Страница 57: ...55 8 6 FOUNDATION PLAN OUTDOOR MODIFICATION 39848189 REV 02 ...
Страница 62: ...60 8 11 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM ...
Страница 63: ...61 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 64: ...62 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 65: ...63 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 66: ...64 8 11 TYPICAL SYSTEM FLOW DIAGRAMS ...
Страница 67: ...65 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 9 0 MAINTENANCE RECORD ...
Страница 68: ...66 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 69: ...67 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...
Страница 70: ...68 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD ...