Assembly location and sequence
Mark the area for the planned system. The area can be determined from technical data in section 3.3 of the
T-Rack
®
variant being erected.
The erection location and orientation of the system can be found in the system plan of the system integrator.
NOTE
ASSEMBLY SEQUENCE
If premanufactured collector pipes are used, e.g. "T-Rack
®
Manifolds" from inge GmbH, it is necessary to first complete the
connecting pipework and then mount the T-Rack
®
3.0.
5.14.6 Connection to existing Connecting Pipework
The Flexi Kit from inge
®
can be used to compensate for small
level differences. This Flexi Kit is not part of the standard scope
of supply but can be ordered optionally.