EonStor / EonStor DS S12/S16/S24 Series
116
134
Pow
Before you power on the RAID system, please power on the expansion JBOD
storage systems first if your network configuration has multiple arrays.
To power on the system please follow the procedures below.
1. Turn on the power switches to the “on” position for every PSUs’ power switches,
from left to right.
er On Procedure
NOTE
Make sure all power supply modules’ switches are turned on!
2. Power on the networking devices, e.g. switches.
3. Power on the host computers. The host computers should be the last devices
that are turned on. Please refer to the documentation that came with your host
computers to see their power on procedures.
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...