EonStor / EonStor DS S12/S16/S24 Series
31
Power Connections
O
drives have be
y installed and
or
nt
interfaces have been connected, the system can be powered on.
131
Checklist
BEFORE
powering on the system, please check the following:
CBM:
Make sure the CBM has been properly installed before
powering-on the system.
Hard drives:
Hard drives are correctly installed in the drive trays.
Drive trays:
All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
ost
or external networking devices.
nding temperature.
nce all hard
en properl
the I/O ports
manageme
Cable connections:
The system has been correctly connected to h
computer(s), management computers,
Ambient temperature:
All system components have been acclimated
to the surrou
NOTE
Make sur
se the power cables
d that are at least 1.2 meters in length.
e you u
provide
DO NOT
use extension cables as the power cables are designed to connect
ONLY
and DIRE
relocatable power t s (RPTs) on server cabinets.
CTLY
to
ap
112
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...