8.2. Procedure for Commissioning and Start-Up (First Installation)
(OUTPUT CONNECTION OF PARALLEL UPS SYSTEMS)
If the UPSs are not factory parallel configured; the initially started-up UPS will operate as master and the
remaining UPS’s will operate as slave. According ID numbers defined for each UPS, Master and Slave
messages should be observed on the LCD panel. On the master unit, candidate master UPS is also shown as
CX.
CX represents the best available master candidate UPS among the slave UPSs. X represents the ID number of
this slave UPS. In case the master UPS fails, then this candidate assigned UPS becomes Master.
Содержание PYRAMID DSP PREMIUM Series
Страница 15: ...9 10 15 20 30kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 16: ...10 40 60kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 17: ...11 80kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 18: ...12 100 120kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 19: ...13 160kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 20: ...14 200 250 300kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 65: ...59 The manufacturer reserves the rights to change the technical specifications and design without notice...