Infineon MicroIAS Скачать руководство пользователя страница 4

 

 

 

4 of 5 

  

 

 

V1.5 

Infineon Alarm System – Quick Start Guide 

 
Revision history 

 

Document 
version 

Date of release 

Description of changes 

0.1 

08/14/2019 

Initial Release 

1.0 

08/21/2019 

Updated figures to reflect proper wire connections on the MicroIAS 
board 

1.1 

10/03/2019 

Updated connectivity text section to ensure IO19 and IO20 are shunted 
correctly for proper functionality 

1.2 

2/27/2020 

Updated pin labeling in Figure 2 

1.3 

3/2/2020 

Added reset procedure after power-up in Section 2 

1.4 

9/15/2020 

Restructuring of figures to reflect latest updates of layout and 
connectivity; updates to start-up procedure section in this document 

1.5 

11/28/2020 

Updated connectivity pictures and power connection description in 
Section 2.1 

Содержание MicroIAS

Страница 1: ...t Guide About this document Scope and purpose The document is the Quick Start Guide for Infineon s Micro IAS It contains information pertaining to the setup and usage of the MicroIAS Intended audience Customers interested in evaluating the MicroIAS Table of Contents About this document 1 Table of Contents 1 1 MicroIAS 2 2 Start up procedure 3 2 1 Connecting the MicroIAS 3 Revision history 4 ...

Страница 2: ...re developer access to all essential interfaces such as UART SWD CON1 connector for development and debug power supply a manual reset SW1 and it provides visual aids LED1 and LED2 for the user to identify power applied LED1 green and alarm triggered LED2 red blinks once for intruder an twice for glass break An external power supply with a 3 6V to 6V range must be applied between GND and VCC on CON...

Страница 3: ...via the matching black red wire pair with receptacle included in the MicroIAS evaluation kit package A battery pack lab power supply or power bank producing a clean 5V output voltage will suffice Connect the red wire to 5V do not exceed 6V as 6V power supplies may damage the on board LDO used to generate the 1 8V for the sensors and the MCU and the black wire to the ground of your power source Onc...

Страница 4: ...19 Updated connectivity text section to ensure IO19 and IO20 are shunted correctly for proper functionality 1 2 2 27 2020 Updated pin labeling in Figure 2 1 3 3 2 2020 Added reset procedure after power up in Section 2 1 4 9 15 2020 Restructuring of figures to reflect latest updates of layout and connectivity updates to start up procedure section in this document 1 5 11 28 2020 Updated connectivity...

Страница 5: ...s in customer s applications The data contained in this document is exclusively intended for technically trained staff It is the responsibility of customer s technical departments to evaluate the suitability of the product for the intended application and the completeness of the product information given in this document with respect to such application For further information on the product techn...

Отзывы: