INFICON
Operation | 6
T-Guard2_Operating-instructions-jina85en1-13-(2009)
55 / 90
6.7 Starting the measurement
Waiting time before the
start (only for carrier
gas measurement)
After closing the measurement chamber, wait for a defined amount of time, which is
calculated as follows:
Start
The measurement is started with the interface or with the selection of “Start”. During
the measurement, bars display the measurement progress. When the measurement is
finished, the display shows the leak rate or a malfunction message. The measurement
can be interrupted at any time by selecting “Stop”. The leak rate displayed at that point
is a provisional value.
Fig. 23: FINE measurement, progress bars
Fig. 24: Leak rate display of an accumulation measurement with information on the helium
background of the sensor and the surroundings.
Содержание 540-200
Страница 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Страница 86: ...15 China RoHS INFICON 86 90 T Guard2_Operating instructions jina85en1 13 2009 15 China RoHS ...
Страница 89: ......
Страница 90: ......