Submenu's
46
Option
Description
COM port
The COM port the card is connected to
Cardswitch
Does the card need to be phy sically released at the end of the
transaction?
Licence ID
Launch sets
Clear launchdata
Clear masterdata
LED
The port the LED is powered f rom
LEGIC Prime
Option
Description
COM port
The COM port the card is connected to
Cardswitch
Does the card need to be phy sically released at the end of the transaction?
LED
The port the LED is powered f rom
Magstripe
In this menu you can set up the connected Magstripe card reader by
selected the appropriate COM port. Magstripe is magnetic card
solution that requires an external card reader.
H6160
Option
Description
COM port
The COM port the card is connected to
Cardswitch
Does the card need to be phy sically released at the end of the transaction?
LED
The port the LED is powered f rom
125KHz (Old)
Option
Description
COM port
The COM port the card is connected to
Cardswitch
Does the card need to be phy sically released at the end of the transaction?
LED
The port the LED is powered f rom
Содержание PayCon II
Страница 1: ...2019 Inepro B V All rights reserved Technical Manual PayCon II PayCon II...
Страница 8: ...I Introduction Part...
Страница 14: ...II Quick Start Part...
Страница 25: ...III Menu Structure Part...
Страница 36: ...Most important items 29 PayCon II...
Страница 37: ...Menu Structure 30...
Страница 38: ...Most important items 31 PayCon II...
Страница 39: ...Menu Structure 32...
Страница 40: ...IV Submenu s Part...
Страница 58: ...V PayCon Browse Tool Part...
Страница 60: ...VI PayCon Update Tool Part...
Страница 70: ...VII How To Part...
Страница 86: ...Products 79 PayCon II How to edit the product properties...
Страница 98: ...VIII Troubleshooting Part...
Страница 103: ...IX Appendixes Part...
Страница 107: ...Appendixes 100...
Страница 108: ...Appendix I 101 PayCon II...
Страница 109: ...Appendixes 102...
Страница 110: ...Appendix I 103 PayCon II...
Страница 111: ...Appendixes 104...
Страница 112: ...Appendix I 105 PayCon II...
Страница 113: ...Appendixes 106...
Страница 114: ...Appendix I 107 PayCon II...
Страница 115: ...Appendixes 108...
Страница 116: ...Appendix I 109 PayCon II...
Страница 117: ...Appendixes 110...
Страница 118: ...Appendix I 111 PayCon II...
Страница 119: ...Appendixes 112 Appendix II Main Board Connections Overview...
Страница 120: ...Appendix II 113 PayCon II...
Страница 127: ...Appendixes 120 Counter pulse Connection A3 size 0 input Connection colour size 1 input Releasing copier output 0...
Страница 129: ...Appendixes 122 Counter pulse ready input Connection A3 size 0 input Releasing copier output 0...
Страница 131: ...Appendixes 124 Counter pulse ready and size Releasing copier output 0...
Страница 138: ...Appendix VI 131 PayCon II 5 Power on your PayCon...
Страница 141: ...Appendixes 134 Appendix VIII CE Declaration of Conformity...
Страница 142: ...Appendix VIII 135 PayCon II...
Страница 144: ......