Introduction
4
Inepro programs each PayCon with a specific service group ID. This
service group ID can not be changed.
Project ID
The project ID can be referred to as a site or customer ID. All
PayCons with the same project ID are compatible with each other.
All PayCons are by default shipped with a project ID which equals
the serial number of the (main) PayCon.
If you have a new site with multiple PayCons you can configure your
PayCons that all cards (Service and User Cards) can be used on all
PayCon systems. During installation you need to make sure that all
PayCons are programmed with the same project ID. This is only
possible with a Service card.
If you want to make multiple Projects compatible with each other but
if you do not have a Service card, this must be done with the menu
option “Make compatible” in the “Terminal” menu. If you do this all
cards can be used in both systems.
Card Types
There are 2 main categories of card types which can be used in the
PayCon:
Содержание PayCon II
Страница 1: ...2019 Inepro B V All rights reserved Technical Manual PayCon II PayCon II...
Страница 8: ...I Introduction Part...
Страница 14: ...II Quick Start Part...
Страница 25: ...III Menu Structure Part...
Страница 36: ...Most important items 29 PayCon II...
Страница 37: ...Menu Structure 30...
Страница 38: ...Most important items 31 PayCon II...
Страница 39: ...Menu Structure 32...
Страница 40: ...IV Submenu s Part...
Страница 58: ...V PayCon Browse Tool Part...
Страница 60: ...VI PayCon Update Tool Part...
Страница 70: ...VII How To Part...
Страница 86: ...Products 79 PayCon II How to edit the product properties...
Страница 98: ...VIII Troubleshooting Part...
Страница 103: ...IX Appendixes Part...
Страница 107: ...Appendixes 100...
Страница 108: ...Appendix I 101 PayCon II...
Страница 109: ...Appendixes 102...
Страница 110: ...Appendix I 103 PayCon II...
Страница 111: ...Appendixes 104...
Страница 112: ...Appendix I 105 PayCon II...
Страница 113: ...Appendixes 106...
Страница 114: ...Appendix I 107 PayCon II...
Страница 115: ...Appendixes 108...
Страница 116: ...Appendix I 109 PayCon II...
Страница 117: ...Appendixes 110...
Страница 118: ...Appendix I 111 PayCon II...
Страница 119: ...Appendixes 112 Appendix II Main Board Connections Overview...
Страница 120: ...Appendix II 113 PayCon II...
Страница 127: ...Appendixes 120 Counter pulse Connection A3 size 0 input Connection colour size 1 input Releasing copier output 0...
Страница 129: ...Appendixes 122 Counter pulse ready input Connection A3 size 0 input Releasing copier output 0...
Страница 131: ...Appendixes 124 Counter pulse ready and size Releasing copier output 0...
Страница 138: ...Appendix VI 131 PayCon II 5 Power on your PayCon...
Страница 141: ...Appendixes 134 Appendix VIII CE Declaration of Conformity...
Страница 142: ...Appendix VIII 135 PayCon II...
Страница 144: ......