93 - PayCon II
# Message
Meaning
0 Unspecif ied reason
The error that has occurred has no prudent error message
1 No v alid purse on card
There is no purse on the card that may be used in this
Pay Con
2 No anony mous cards allowed
This card is not linked to a User, and that is not allowed in
this Pay Con
3
Card remov ed during
initialisation
Y ou hav e remov ed the card while it was initialised in the
Pay Con
4 Wrong currency f lag
The currency on y our card dif f ers f rom that on the Pay Con
5 Card/ID module not enabled
The ECOS module Card/ID is not enabled in this Pay Con,
so y ou can't use cards
6 Busy handeling prev ious card The Pay Con is busy with actions concerning the last card
7 Prev ious card still locked
The prev ious card has not been released, it has probably
been remov ed too soon
8
All user cards blocked (by
casher)
9
Card not claimed by any
module
The card has not been recognised by any of the card
readers in this Pay Con. Please try again. If the problem
continues either the Pay Con or the card has a def ect.
Please restart the Pay Con and try y our card in another
Pay Con and try other cards in this Pay Con to decide which
one has the problem.
1
0
Unknown serv ice card
The card is recognised as a serv ice card, but may not be
used on this Pay Con
1
1
'Old' Inepro card rejected
according to the '4442 -> old
cards -> reject' rule
The rule in the Pay Con dictates that the old (ty pe of ) card
y ou hav e presented to the Pay Con is rejected.
1
2
Card Project ID not in
compatibility list
Y our card is f rom a dif f erent project, another school,
company or location and may not be used in this project
1
3
Old non-AES card not
accepted, because
AES/Mif are is enabled
Y our card has a lower security lev el than the lev el of
security that is required in this Pay Con.
Содержание PayCon II
Страница 1: ...2019 Inepro B V All rights reserved Technical Manual PayCon II PayCon II...
Страница 8: ...I Introduction Part...
Страница 14: ...II Quick Start Part...
Страница 25: ...III Menu Structure Part...
Страница 36: ...Most important items 29 PayCon II...
Страница 37: ...Menu Structure 30...
Страница 38: ...Most important items 31 PayCon II...
Страница 39: ...Menu Structure 32...
Страница 40: ...IV Submenu s Part...
Страница 58: ...V PayCon Browse Tool Part...
Страница 60: ...VI PayCon Update Tool Part...
Страница 70: ...VII How To Part...
Страница 86: ...Products 79 PayCon II How to edit the product properties...
Страница 98: ...VIII Troubleshooting Part...
Страница 103: ...IX Appendixes Part...
Страница 107: ...Appendixes 100...
Страница 108: ...Appendix I 101 PayCon II...
Страница 109: ...Appendixes 102...
Страница 110: ...Appendix I 103 PayCon II...
Страница 111: ...Appendixes 104...
Страница 112: ...Appendix I 105 PayCon II...
Страница 113: ...Appendixes 106...
Страница 114: ...Appendix I 107 PayCon II...
Страница 115: ...Appendixes 108...
Страница 116: ...Appendix I 109 PayCon II...
Страница 117: ...Appendixes 110...
Страница 118: ...Appendix I 111 PayCon II...
Страница 119: ...Appendixes 112 Appendix II Main Board Connections Overview...
Страница 120: ...Appendix II 113 PayCon II...
Страница 127: ...Appendixes 120 Counter pulse Connection A3 size 0 input Connection colour size 1 input Releasing copier output 0...
Страница 129: ...Appendixes 122 Counter pulse ready input Connection A3 size 0 input Releasing copier output 0...
Страница 131: ...Appendixes 124 Counter pulse ready and size Releasing copier output 0...
Страница 138: ...Appendix VI 131 PayCon II 5 Power on your PayCon...
Страница 141: ...Appendixes 134 Appendix VIII CE Declaration of Conformity...
Страница 142: ...Appendix VIII 135 PayCon II...
Страница 144: ......