background image

 

01.05.2014 (release date and version)  

_________________________________________________________________________________ 
FB TS AS7 01                    ICG® Standard Operating Procedure | released by ICG® Service Department                                                                   1 

 

 

TASK DESCRIPTION:

 

                  · Unpacking & assembling TOMAHAWK IC5 & IC7 / MATRIX IC5 & IC7 Indoor Cycle 

                                          

· IC7 console commissioning process

 

 

Applicable for Product: 
 

-IC5 & IC7 Tomahawk powered by ICG 
-IC5 & IC7 Matrix powered by ICG 

 

Applicable for Product Version: 

-IC5 & IC7 two-stage drivetrain 

 

Applicable for Product Art. No.: 
For both SKU´s THK IC5 & IC7 powered by 
ICG and Matrix IC5 & IC7 powered by ICG  

- THK: IC-TKIC5B-01 
- MX: IC-MXIC5B-01 
- THK: IC-TKIC7B-01 
- MX: IC-MXIC7B-01 

 

Applicable for Product Serial No.: 
 

- THK IC5: TAQB0000001-14D > …… 
- MX IC5: LAQB0000001-14E > …… 
- THK IC7: TARB0000001-14B > …… 
- MX IC7: LARB0000001-14B > …… 

 

 

The product article number and product serial number information can be found on the tag plate label positioned on the lateral frame 
tube as shown below. Please make sure to identify the product prior to performing any repair work.  

 

 

 

 

 

 

 

 

 

 

Содержание TOMAHAWK IC5

Страница 1: ...by ICG Applicable for Product Version IC5 IC7 two stage drivetrain Applicable for Product Art No For both SKU s THK IC5 IC7 powered by ICG and Matrix IC5 IC7 powered by ICG THK IC TKIC5B 01 MX IC MXIC...

Страница 2: ...rsion _________________________________________________________________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 2 ALL PART DESCRIPTIONS DRAWING...

Страница 3: ...ludes Button Head Sleeve with Internal Thread Hex Socket M8 x35 x 1 5P ss304 Stainless Steel 1x Button Head Bolt Hex Socket M8 x12 x 1 5P ss304 Stainless Steel ISO7380 1x Transport Wheel 1x 2 F 140 02...

Страница 4: ...REQUIRED TOOLS TOOLS SIZE MM QUANTITY Open end spanner or equivalent 17mm 1 Pedal wrench 15mm 1 Hex socket 13mm 1 Open end spanner or equivalent 10mm 1 Straight shaft round head 6mm Allen socket 6mm 1...

Страница 5: ...fore assembly Please refer to our service video WARNING The IC7 indoor cycle is very heavy It requires at least 2 people to remove the bike from the packaging and for assembly the bike as it s describ...

Страница 6: ...ting Procedure released by ICG Service Department 6 1 Rear stabilizer assembly a Secure upper handlebar and seat post sliders Tilt bike carefully until it rests on the floor supported by the front Sty...

Страница 7: ...S7 01 ICG Standard Operating Procedure released by ICG Service Department 7 2 Front stabilizer assembly a Carefully tilt bike until the rear part of the shroud rests on the Styrofoam as shown on the p...

Страница 8: ...sition a Place the bike as shown on the picture b Make sure that the seat is fixed in a level horizontal and vertical position Seat clamp must be tightened securely from both sides to minimize looseni...

Страница 9: ...ape on slider prior to handlebar is mounted to the upper slider b ATTENTION Place the flat handlebar support under the console bracket as shown on the picture Mount handlebar weldment using the M8 x 2...

Страница 10: ...assembly a Carefully slide the IC7 console into its console bracket b Tighten by hand the M 5 x 25 x 0 8P bolt attaching the IC7console to the handlebar by using the 3mm Allen Key a b 6 Pedal assembly...

Страница 11: ...dard Operating Procedure released by ICG Service Department 11 7 End of the assembly process Simulate a brief session checking the bike is in good working order 8 IC7 console commissioning a Turn cran...

Страница 12: ...______________________________________________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 12 9 Settings Select GENERAL from the main menu and foll...

Страница 13: ...________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 13 10 Brake Calibration Select BRAKE CALIBRATION from the main menu and follow the instructions until finalize...

Страница 14: ...______________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 14 11 Offset Select OFFSET from the main menu and follow the instructions until finalize...

Страница 15: ...andard Operating Procedure released by ICG Service Department 15 12 End of operation Select EXIT once you finish the BRAKE CALIBRATION and OFFSET process Please refer to the IC7 console owner manual t...

Отзывы: