Maintenance Summary - 2.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number DIE018EN - 05.06.2019.
- Check maintenance logs of servicing activities
- Check work area door (optionally with electr. drive) and viewing glass
- Check tool clamping sets of the milling spindles (from Berg)
- Checking and potentially replacing the cooling lubricant adapter (HSK tool mountings)
- Check telescopic covers and wipers
- Check outer wipers of linear guides
- Check all electrical connections and drive belts of the drive motors
- Replace filter on air conditioner cooling fan
- Check cooling unit for cooling lubricant
- Check coolant
- Clean labyrinth rings of spindles
- Check backup data carrier
- Check control cabinet
- Replace hydraulic fluid filters
- Wassermann tool change system
Maintenance Summary - 2.000 Operating hours
34
Maintenance Instructions
G220
DIE017EN - 05.06.2019
Содержание C200-sl
Страница 8: ...Preface 4 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Страница 86: ...Maintenance Summary 8 000 Operating hours 82 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Страница 87: ...Service Interval 5 Years Service Interval 5 Years 83 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Страница 91: ...Service Interval 8 Years Service Interval 8 Years 87 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Страница 101: ......