Orientation
The pneumatic system is composed of two components. The system section and
the sealing air section (option). To ensure trouble-free operation, periodic checks of
the pneumatic system are necessary.
- Check oil level at oiler (optional).
- Check fluid lines.
- Check silencers.
- Replace filter.
- Drain condensate (not applicable to auto-drain).
- Check the pressure settings on the pressure gauges (system and sealing air).
Due to different requirements and/or specifications of the respective
manufacturers, be sure to review the respective manufacturer's
documentation!
Example: Pneumatic maintenance unit by Festo/ Norgren
Procedure
1.
Power off the machine to depressurize the pneumatic system
and secure against accidental switching on.
Check oil level at oiler (optional).
2. Check supply and fluid lines (damage and leakage). Supply and fluid lines must
be checked for damage. Pre-damage such as kinks or abrasions should be
logged and replacement should be initiated.
Maintenance Summary - 4.000 Operating hours
74
Maintenance Instructions
ABC.2
DIE244EN - 15.08.2022
Содержание ABC 2 Series
Страница 6: ...Table of contents IV Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...
Страница 50: ...Maintenance Summary 1 000 Operating hours 44 Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...
Страница 72: ...Maintenance Summary 2 000 Operating hours 66 Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...
Страница 109: ...Service Interval 5 Years Service Interval 5 Years 103 Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...
Страница 114: ...Maintenance Summary 5 Years 108 Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...
Страница 115: ...Service Interval 8 Years Service Interval 8 Years 109 Maintenance Instructions ABC 2 DIE244EN 15 08 2022 ...