![IMT IQL Helios Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/imt/iql-helios/iql-helios_user-manual_2049967013.webp)
User Manual
IQL® Helios Area-/Streetlight
User Manual
IQL® Helios Area-/Streetlight
13
Version 4.6 201302
7.
Use
7.1
Commissioning
The light fitting can be switched on immediately after installation.
7.2
Insulation test
Installations in which IQL light fittings are installed can be checked with an insulation test. For this test, apply a
maximum of 500 Vdc between earth and a phase
or
neutral connection.
WARNING
Never apply more than 500 Vdc between a phase and a neutral connection.
During production, all light fittings have been subjected to a dielectric test (2100 Vdc for 60 seconds). In
addition, the light fittings have also been subjected to an endurance test.
8.
Maintenance
The light fitting’s critical components (the light compartment consisting of the reflector with glass and the
sealed off electronics compartment) are ‘sealed for life’ and cannot be opened. Consequently maintenance as
laid down in the IEC 60079-17 standard is not applicable; a visual inspection for correct operation will suffice.
WARNING
Opening the light compartment or electronics compartment voids the guarantee.
9.
Recycling
For recycling the light fitting, agreements have been made with local bodies within the context of the WEEE
directive.
Contact your local partner (see the chapter ‘Contact details’). The local partner will be responsible for further
processing.
10.
Contact details
IMT B.V.
Pascalweg 10a, 4104 BG Culemborg
P.O. Box 88, 4100 AB Culemborg
THE NETHERLANDS
Phone : +31 (0)88 – 12 69 100
Fax
: +31 (0)88 – 12 69 101
E-mail : [email protected]
For an up-to-date overview of all national and international contacts, visit our website: www.imt.eu.