Immergas VICTRIX PRO 55 1 A Скачать руководство пользователя страница 6

6

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

1.2  POSITION OF THE APPLIANCES. 

The boilers can be installed:

- outdoors;
- in outdoor environments, also adjoining the 

building served, located in uncovered space, as 

long as structurally separated and without walls 

in common, or situated on the flat covering of 

the building served, always without walls in 

common;

- in building also destined for other use or in 

places inserted in the volume of the building 

served.

These rooms must be intended exclusively to 

house CH systems and must have characteristics 

that comply with legislation in force.

Attention:

 the installation of appliances powered 

with gas with a greater density than 0.8 (L.P.G.) 

is only allowed in places out of the ground, 

also communicating with places that are on the 

ground. In both cases the walkway must not have 

hollows or depressions such to create gas pockets 

that determine dangerous conditions.

Height of the installation room.

Installation of individual appliance

: the room 

must have a minimum ceiling height of 2 m.

Installation of multiple appliances in cascade:

 con-

sidering the size of the boiler, the flue manifold 

(which must be installed on a 3% gradient) and 

the hydraulic manifolds, the room must have a 

minimum ceiling height of 2.3 m.
The aforementioned heights allow for correct 

installation of the appliances and observe the 

technical regulations in force.

Position of the appliances in the room.

Individual appliance

: the distances between 

any external point of the boiler and the vertical 

and horizontal walls of the room must allow 

accessibility to the regulation, safety and control 

elements for routine maintenance.

Multiple appliances, not interconnected, but in-

stalled in the same room

: the minimum distance 

to maintain between several boilers installed 

on the same wall must be 200 mm, in order to 

allow accessibility to the regulation, safety and 

control elements and routine maintenance of all 

appliances installed.

Cascade installation

: The instructions for correct 

cascade installation are provided in the respec-

tive documents or on the www.immergas.com 

website in the high power section.

1.3  AERATION AND VENTILATION OF 

THE INSTALLATION ROOMS.

The rooms must have one or more permanent 

openings for aeration on external walls. The 

openings used for aeration can be protected 

using metal grills, meshes and/or rain-proof fins 

as long as the net aeration surface is not reduced.

Aeration for installation in outdoor places.

 The 

minimum free surfaces, in relation to the overall 

heat input must not be below:

a)  above-ground rooms (S ≥ Q x 10)
    S > 515 cm

2

 for every Victrix Pro 55 1A

    (ex: to install 3 Victrix Pro 55 1A in cascade, 

the minimum surface is 515 x 3 = 1545 cm

2

)

b)  basements and underground rooms up to a 

height of -5 m from the reference surface (S 

≥ Q x 15).

    S > 775 cm

2

 for every Victrix Pro 55 1A

    (ex: to install 3 Victrix Pro 55 1A in cascade, 

the minimum surface is 775 x 3 = 2325 cm

2

)

c)  underground rooms at quota between -5 m 

and -10 m from the reference surface (S ≥ Q 

x 20 with a minimum of 5000 cm

2

).

    S > 5000 cm

2

 for all configurations

In all cases each opening must not have a net 

surface area less than 100 cm

2

.

Attention:

 in the case of installation of appliances 

powered with gas with greater density than 0.8 

(L.P.G.) in outdoor places, above-ground, at least 

2/3 of the aeration surface must be flush with the 

floor, with a minimum height of 0.2 m. 

The aeration openings must be at least 2 m for 

heating capacities not exceeding 116 kW and 4.5 

m for higher heating capacities, cavities, depres-

sions or openings communicating with rooms 

below the walkway surface or draining ducts.

Aeration for installation in building also des-

tined for other use or in places inserted in the 

volume of the building served.

 The aeration 

surface must not be less than 3000 cm

2

 in the case 

of natural gas and must not be less than 5000 cm

2

 

in the case of L.P.G..
The installation must comply with the require-

ments of all relevant codes and standards.

1.4  OUTDOOR INSTALLATION.

The boiler has an IPX5D electric insulation rat-

ing and can also be installed outdoors, without 

additional protections.

Attention:

 all optional kits that can be potentially 

connected to the boiler must be protected on the 

basis of their electrical protection rating.

1.5  ANTI-FREEZE PROTECTION.

Minimum temperature -5°C.

 The boiler comes 

standard with an anti-freeze function that ac-

tivates the pump and burner when the system 

water temperature in the boiler falls below 5°C.

The anti-freeze function is only guaranteed if:

- the boiler is correctly connected to gas and 

electricity power supply circuits;

- the boiler is powered constantly;
- Main switch is inserted;
- the boiler is not in no ignition block
-  the boiler essential components are not faulty.

In these conditions the boiler is protected against 

freezing to an ambient temperature of -5°C.

Minimum temperature -15°C.

 If the boiler is 

installed in a place where the temperature falls 

below -5°C and in the event there is no gas (or 

the boiler goes into failed ignition block), the 

appliance can freeze.

To prevent the risk of freezing follow the 

instructions below:

-  Protect the central heating circuit from freezing 

by inserting a good-quality antifreeze liquid 

into this circuit, which is specially suited 

for central heating systems and which is 

manufacturer guaranteed not to cause damage 

to the heat exchanger or other components of 

the boiler.

  The antifreeze liquid must not be harmful to 

one’s health.

. The instructions of the manufacturer of this 

liquid must be followed scrupulously regarding 

the percentage necessary with respect to the 

minimum temperature at which the system 

must be kept. An aqueous solution must be 

made with a potential water pollution class of 2 

(EN 1717:2002 or local regulations in force).

The materials used for the central heating circuit

 

of 

Immergas boilers withstand ethylene and propyl-

ene glycol based antifreeze liquids (if the mixtures 

are prepared perfectly).

For life and possible disposal, follow the supplier’s 

instructions.

- Protect the condensate drain trap and relative 

drain against freezing by using an accessory 

supplied on request (anti-freeze kit) comprising 

two electric resistances, the relevant cables and 

a control thermostat (carefully read the instal-

lation instructions contained in the accessory 

kit pack).

Boiler anti-freeze protection is thus ensured only if:

- the boiler is correctly connected to electricity 

power supply circuits;

-  main switch is inserted;
-  the anti-freeze kit components are efficient.
In these conditions the boiler is protected against 

freezing to temperature of -15°C.

The warranty does not cover damage due to inter-

ruption of the electrical power supply and failure 

to comply with that stated on the previous page.

Содержание VICTRIX PRO 55 1 A

Страница 1: ...VICTRIX PRO 55 1 A Wall mounted heating only boiler User Installation Instruction Manual AU...

Страница 2: ......

Страница 3: ...rder to install the product correctly Maintenance must be carried out by Authorised Service Personal The appliance must only be destined for the use for which it has been expressly declared Any other...

Страница 4: ...ting 24 2 7 Info menu 26 2 8 Boiler shutdown 26 2 9 Restoring central heating system pressure 26 2 10 System drainage 26 2 11Anti freeze protection 26 2 12Case cleaning 26 2 13Decommissioning 26 3 Boi...

Страница 5: ...ell as their eventual replacement withappliancesand or equivalent components Installation must be carried out according to regulation standards AS NZS 5601 or Local Authority laws Attention these boil...

Страница 6: ...ove ground at least 2 3 of the aeration surface must be flush with the floor with a minimum height of 0 2 m The aeration openings must be at least 2 m for heating capacities not exceeding 116 kW and 4...

Страница 7: ...in case of supply from LPG depot New LPG storage tanks may contain residual inert gases nitrogen that degrade the mixture delivered to the appliance causing problems with boiler operation Due to the...

Страница 8: ...t Heating decline any responsibility for damage or physical injury caused by failure to connect the boiler to an efficient earth system or failure to comply with the reference standards Also ensure th...

Страница 9: ...heat adjuster via 2 wires Thermostat electrical connection Fig 1 5 Thermoregulation electrical connections must be carried out on the boiler terminal board eliminating jumper X40 Thermostat or On Off...

Страница 10: ...on Type C configuration sealed chamber and fan assisted The boiler leaves the factory with B23 configuration to change the configuration of the boiler to type C sealed chamber and fan assisted disasse...

Страница 11: ...t 1 3 m Terminal complete with vertical exhaust 80 Exhaust m 3 DUCT TYPE Equivalent length in m of concentric pipe 80 125 Concentric pipe 80 125 m 1 1 0 m Concentric bend 90 80 125 1 9 m Concentric be...

Страница 12: ...ent space to carry out the tests required by law upon commissioning The intake exhaust terminal if properly in stalled is pleasant to look at on the outside of the building Make sure that the external...

Страница 13: ...er 1 up to the relevant groove Fix it to the lid using the previously disassembled sheet steel plate 3 Installation of the fake aluminium tile replace the tiles with the aluminium sheet 5 shaping it t...

Страница 14: ...m length MAX L Fig 1 16 The kit with this configuration can be extended up to a max measurement of 30 0 m with Victrix Pro 55 1A including the terminal Using the 80 vertical terminal for direct dis ch...

Страница 15: ...and external 4 wall sealing plate has been fitted This will ensure sealing and joining of the elements making up the kit Horizontal kit 80 with exhaust in flue Kit assembly Fig 1 22 install the 80 be...

Страница 16: ...em refer to the technical standard in force This divides the systems and therefore the start up operations into three categories new systems modified systems re activated systems In particular for new...

Страница 17: ...of 18 C between flow and return During DHW mode the pump always runs at the maximum speed Pump release If after a prolonged period of inactivity the circulation pump is blocked unscrew the front cap...

Страница 18: ...densation module cover 12 Igniter 13 Ignition electrode 14 Flue probe 15 Condensing module air vent valve 16 Fumes hood 17 Sample points air A flue gas F 18 Heat exchanger safety thermal fuse 19 Manua...

Страница 19: ...circuit breaker switches andofthethermometer notsuppliedasstandard with the boiler must be set up as described in the installation instructions in compliance with theprovisionsofthe R collection Whene...

Страница 20: ...ng circuit pump CMI 1 13 Zone 2 central heating circuit pump CMI 2 14 Zone 3 direct circuit pump CD 15 Storage tank unit feeding pump 16 Zone 1 safety thermostat CMI 1 17 Zone 2 safety thermostat CMI...

Страница 21: ...the heating system if anti freeze is not used b shut off all electrical water and gas supplies N B in the case of maintenance interventions on the boiler that lead to the closure of one or both system...

Страница 22: ...24 Pump running 25 Summer mode 2 5 USING THE BOILER Before ignition make sure that the system is full of water checking that the manometer 5 indicates a base value at which the system has been design...

Страница 23: ...maintain the previous setting 2 4 2 5 Stand by mode by pressing buttons A and C at the same time it is possible to place the boiler in stand by In this mode the boiler is considered powered on but no...

Страница 24: ...re The error may be caused by a poor thermal probe contact or a system with excessive thermal inertia Press the Reset button 1 0A17 Poor thermal return NTC probe contact During boiler operation the bo...

Страница 25: ...on incorrect in stand by With the boiler in stand by the board detects an anomalous difference between the NTC probe flow and return temperatures The error may be caused by a failure in one of the two...

Страница 26: ...ned frequently filling must be carried out with suitably treated water to eliminate hardness that can cause lime scale 2 12 CASE CLEANING Use damp cloths and neutral detergent to clean the boiler casi...

Страница 27: ...ified check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided ensure the gas inlet working pressure is correct 1 1 Kpa Natural Gas 2 75 Kp...

Страница 28: ...Fan M30 Three way valve optional Configure the corresponding parameters when connecting in simple cascade or when con necting in system side flow probe or D H W pump S1 Main switch Y1 Gas valve 1 Exte...

Страница 29: ...10 Flue probe B25 System flow meter E4 Safety thermostat E5 Heat exchanger safety thermostat manual reset E13 Flue safety thermofuse M1 Boiler circulator pump M20 Fan S5 Absolute pressure switch S20 O...

Страница 30: ...inlet Clean contact Max 230 Vac 1 A Key B1 System flow probe NTC B2 Domestic hot water probe NTC B4 External probe M2 Plant CH pump M30 3 way valve Note probe B1 B2 B4 Connection cable diameter 3 7 m...

Страница 31: ...ve is open Incorrect adjustment of the gas valve check the correct calibration of the gas valve Irregular combustion or noisiness It may be caused by a dirty burner incorrect combustion parameters int...

Страница 32: ...d by multiplying the value displayed by 50 P26 120 0 P12 Boiler s modulation ratio It defines the boiler s modulation ratio Do not modify 0 100 10 P13 Boiler power Used to calculate the boiler power i...

Страница 33: ...46 P31 Unit of measurement This defines the unit of measure on the display whether metric or Imperial 0 127 C kW 128 256 F kBTu h 0 P32 Min Heating Set Temp Limits the minimum value of the heating se...

Страница 34: ...e turn the adjustment screw 3 in a clockwise direction and vice versa to decrease it Calibration of maximum CO2 When you finish the minimum CO2 adjustment turn the boiler on and start the chimney swee...

Страница 35: ...obe must be connected to terminals S1 and S2 and parameter P38 must be set up whereas the pump must be connected to termi nals C and D If there is a DHW circuit it can be connected via an external 3 w...

Страница 36: ...e replaced at least every two years regardless of their state of wear Check that the burner is intact that it has no deformations or cuts and that it is properly fixed to the combustion chamber lid ot...

Страница 37: ...to de tach it from the central hooks and then slide it downwards take the two clamping screws out 4 from the control panel with their rings 5 press the two side hooks 7 and tilt the control panel 6 re...

Страница 38: ...38 3 15 1 6 8 9 9 12 12 10 11 13 13 13 13 A A Rif A 7 7 INSTALLER USER MAINTENANCE TECHNICIAN Ref A...

Страница 39: ...43 6550 3 98 6450 49 0 223 1 5 32 6430 3 91 6330 47 0 213 4 5 09 6170 3 74 6060 45 0 204 0 4 87 5910 3 57 5810 43 0 194 6 4 64 5660 3 41 5550 41 0 185 4 4 42 5410 3 25 5300 39 0 176 3 4 21 5160 3 09 5...

Страница 40: ...06 8 99 7 Efficiency 40 30 Nom Min 107 4 103 5 Heat loss at casing with burner Off On 80 60 C 0 30 0 90 Heat loss at flue with burner Off On 80 60 C 0 03 1 80 Central heating circuit max operating pre...

Страница 41: ...41 INSTALLER USER MAINTENANCE TECHNICIAN 3 27 EXPLODED BOILER DIAGRAM 17 05 17 3 024493 5647076 SERIAL NUMBER START OF SERIES VICTRIX PRO 55 1 A 82D...

Страница 42: ...r 10x5 2x1 90 1 8599 Washer 4 3x12 91 3 023387 Flue hood group 92 1 025278 Plug for flange with sample points 93 1 036108 Flue exhaust pipe d 80 94 1 020368 Lip gasket d 80 95 1 034463 Frame 96 1 0352...

Страница 43: ...inhibitor was used Quantity Litres Has a system filter been installed Yes No HEATING MODE measure and record Burner inlet gas working pressure at maximum rate Kpa OR gas inlet pressure Kpa Central he...

Страница 44: ...lights and heats the water Check gas flame is the correct colour and for gas and water leaks as the system heats up 11 Check that heat is circulating to all radiators through the manual or thermostat...

Страница 45: ...ame Telephone No Plumbing Licence No Record At max rate CO ppm CO CO CO Ratio At mim rate CO ppm CO CO CO Ratio Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Plumbing Lice...

Страница 46: ...one No Plumbing Licence No Record At max rate CO ppm CO CO CO Ratio At mim rate CO ppm CO CO CO Ratio Comments Signature SERVICE 10 Date Engineer name Company name Telephone No Plumbing Licence No Rec...

Страница 47: ......

Страница 48: ...This instruction booklet is made of ecological paper Cod 1 039823 rev ST 002925 001 03 18 AS NZS 5263 1 2 Cert SAI 400090 SAI Global...

Отзывы: